Loading…
Loading…
Tender Value
₹13.0 Cr
EMD Value
₹26.0 L
Closing Date
8 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
SC-MUE section : TFTR-Cess Work with Toe Bank under ADEN/NZB jurisdiction
81_DRM_W_HYB_26
81_DRM_W_HYB_26
Open
12 Months
Surajpur, Chhattisgarh
₹0
₹26.0 L
12 Jun 2026
12 Jun 2026
24 Jun 2026
A2-DSR items for Transportation of Earth Material 1764260.00 Below/P
Item Breakup - A1-USSR items for Earthwork
cum Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in- Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract.
8000.00 except rock HYDERABAD DIVISION-ENGINEERING/SOUTH CENTRAL RLY Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out the execution of the work and shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be the property of the Contractor.
6000.00 one horizontal pattern of minimum 5mm dia.
135870.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment.
100.00 3471.50 3.0m x3.0m on cess, placing with released unserviceable PSC sleepers and keeping them at all four sides of refuge and also placing as matting inside the refuge by keeping them in upside down position with a minimum of 14 sleepers including levelling with earth, excavation, all lead and lift, crossing of tracks, leading the sleepers with in a free lead and lift, handling etc., with all contractor's men material complete and as directed by the Engineer-in-charge. Note: Earth-work will to be paid separately under relevant item. Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
700.00 minimum 1.10 cum bucket capacity Total 128327631.40
Item Breakup - A2-DSR items for Transportation of Earth Material
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf Approved brand
ATTACHMENT
concretemixdesignsystemimprovements.pdf
ATTACHMENT
SpecialConditionsforPaymentofSteel_1.pdf
ATTACHMENT
LaboratorySplconditionslatest.pdf
ATTACHMENT
Tenderdocument24.09.2024_1.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf
ATTACHMENT
ContractorseMBrecord.pdf
ATTACHMENT
GCC2022_compressed.pdf
ATTACHMENT
TOEBANKSPLCONDITIONS2026.pdf
ATTACHMENT
CESSREPAIRSPLCONDITIONS.pdf
ATTACHMENT
TFTRTOEBANKLOCATIONS.pdf
ATTACHMENT
Download all tender documents and submit your bid