Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.3 CrAccepted-Finance 48 5B2 SRI SHWETHA COMPLEX THANJAI MAIN ROAD THIRUVERUMBUR TRICHY 620013 | TRICHY | TIRUCHIRAPPALLI | TAMIL NADU | 620013 | ₹10.3 Cr | 1 | Accepted-Finance L1 Tenderer |
| 2 | 2₹10.7 CrRejected-Finance 12 PALANI ANDAVAR COLONY ALAGAR KOYIL ROAD MADURAI 625002 | MADURAI | TAMIL NADU | 625002 | ₹10.7 Cr | 2 | Rejected-Finance L2 Tenderer |
| 3 | 3₹11.0 CrRejected-Finance SALEM SALEM TAMIL NADU | ₹11.0 Cr | 3 | Rejected-Finance L3 Tenderer |
| Sl No | Description | Qty | Unit | vignesshandco L2 | p.sivaperumal L3 | SD INFRA PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils including weathered rock not requiring blasting and depositing on bank with initial leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental charges such as bailing out water providing and maintaining necesssary coffer dams sheeting, shoring, bracing and their subsequent removal, of logs, stumps and other deleterious matter and obstructions trimming bottom of excuation back filling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for labour, equipments and all incidental charges backfilling and clearing the site for PILE CAPS UNDER ABUTMENT, PIERS AND FOUNDATION OF RETAINING WALL as per Section 300 of MORT&H specifications (V Revision).
I. For Depth upto 2.00m | 466 | Cum | 319.37 ₹1.5 L | 328.16 ₹1.5 L | 307 ₹1.4 L |
| 1.10 | II. For Depth 2.00m to 3.00m | 36 | Cum | 332.91 ₹11,984.76 | 342.07 ₹12,314.52 | 307 ₹11,052 |
| 2.00 | Providing reinforced cement concrete cast-in-situ bored piles of 1200mm dismeter in RCC M35 (Design mix) using 20 mm ISS HBG graded metal with minimum cement content of 400 kg per cu. m maximum water cement ratio of 0.4 and slump of 150 - 200 mm by tremie concreting includingmcost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same from one pile locaton to another pile location dismantling and including all labour for boring through all soils, leading the excavated earth to a distance 200 m including forming of working platform over the river bed for accomadating piling equipment forming approaches to the working platform, mixing concrete, filling it in position by tremie pipe, cutting of pile head to cut-off level for casting pilecsp, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW ABUTMENT And PIERS as per section 1100 & 1700 of MORT&H specification (V revision). | 812 | Rm | 21,266.99 ₹1.7 Cr | 21,852.32 ₹1.8 Cr | 20,477 ₹1.7 Cr |
| 3.00 | Plain Cement concrete M15 (Nominal mix) using using 40mm ISS mental including cost and conveyance of all materials to site and cost of cement at site including soft water, labour chargera for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc.,complete.,complete for LEVELLING COURSE BELOW PILECAPS OF ABUTMENT AND PIERS as per section 1100 of MORT&H specification (V Revision). | 16 | Cum | 8,303.62 ₹1.3 L | 8,532.16 ₹1.4 L | 7,997 ₹1.3 L |
| 4.00 | Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel inlcuding cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc.,complete, for PILECAPS UNDER ABUTMENT AND PIER as per section 1100, 1500 & 1700 of MORT&H specification (V Revision). | 389 | Cum | 12,249.42 ₹47.7 L | 12,586.56 ₹49.0 L | 11,797 ₹45.9 L |
| 5.00 | Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel inlcuding cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc.,complete, for COLUMN PIER above PILECAP as per section 1100, 1500 & 1700 of MORT&H specification (V Revision). | 132 | Cum | 14,241.94 ₹18.8 L | 14,633.92 ₹19.3 L | 13,777 ₹18.2 L |
| 6.00 | Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and facrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for as per section 1500, 1700&2200 of MORT&H specification (V Revision) for CAPPING BEAM OVER PIERS. | 141 | Cum | 14,280.09 ₹20.1 L | 14,673.12 ₹20.7 L | 13,777 ₹19.4 L |
| 7.00 | Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and facrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for PEDESTALS OVER PIERS AND ABUTMENTS as per section 1500, 1700 & 2200 of MORT&H specification (V Revision). | 6 | Cum | 16,090.58 ₹96,543.48 | 16,533.44 ₹99,200.64 | 15,477 ₹92,862 |
| 8.00 | Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, vibration charges, working at at heights, soft water and hire charges for tools and plants, including all other incidental charges etc, complete as per relevant standard spectification for T-BEAMS and CROSS BEAMS as per section 1500,1700 & 2300 of MORT&H specification (V Revision). | 758 | Cum | 21,071.88 ₹1.6 Cr | 21,651.84 ₹1.6 Cr | 20,277 ₹1.5 Cr |
| 9.00 | Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete as per sec 1500,1700 & 2300 of MORT&H specification (V Revision) for Deck slab. | 420 | Cum | 20,597.73 ₹86.5 L | 21,164.64 ₹88.9 L | 19,877 ₹83.5 L |
Tender Value
₹9.8 Cr
EMD Value
₹5.1 L
Closing Date
27 Feb 2026, 12:15 pmClosed
Thiru.R.K.Ramesh
O/o the Superintending Engineer Highways Projects Circle Alagarkovil Main Road Madurai 2
Balance Works (Construction of Adjacent Spans of Railway Spans in lieu of LC No.20 and LC No.1) for the main work of Construction of Road over Bridge in lieu of LC 20 and LC 1
2026_HWAY_661907_1
TN No 18 2025-26 SDO Dated.16.02.2026
Open Tender
Civil Works - Highways
240 days
Needamangalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5.1 L
O/o the Superintending Engineer Highways Projects
3 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
20 Feb 2026 - 26 Feb 2026
25 Feb 2026
Earth work excavation in all classes of soils including weathered rock not requiring blasting and depositing on bank with initial leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental charges such as bailing out water providing and maintaining necesssary coffer dams sheeting, shoring, bracing and their subsequent removal, of logs, stumps and other deleterious matter and obstructions trimming bottom of excuation back filling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for labour, equipments and all incidental charges backfilling and clearing the site for PILE CAPS UNDER ABUTMENT, PIERS AND FOUNDATION OF RETAINING WALL as per Section 300 of MORT&H specifications (V Revision). I. For Depth upto 2.00m
II. For Depth 2.00m to 3.00m
Providing reinforced cement concrete cast-in-situ bored piles of 1200mm dismeter in RCC M35 (Design mix) using 20 mm ISS HBG graded metal with minimum cement content of 400 kg per cu. m maximum water cement ratio of 0.4 and slump of 150 - 200 mm by tremie concreting includingmcost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same from one pile locaton to another pile location dismantling and including all labour for boring through all soils, leading the excavated earth to a distance 200 m including forming of working platform over the river bed for accomadating piling equipment forming approaches to the working platform, mixing concrete, filling it in position by tremie pipe, cutting of pile head to cut-off level for casting pilecsp, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW ABUTMENT And PIERS as per section 1100 & 1700 of MORT&H specification (V revision).
Plain Cement concrete M15 (Nominal mix) using using 40mm ISS mental including cost and conveyance of all materials to site and cost of cement at site including soft water, labour chargera for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc.,complete.,complete for LEVELLING COURSE BELOW PILECAPS OF ABUTMENT AND PIERS as per section 1100 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel inlcuding cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc.,complete, for PILECAPS UNDER ABUTMENT AND PIER as per section 1100, 1500 & 1700 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials to site excluding cost of steel inlcuding cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc.,complete, for COLUMN PIER above PILECAP as per section 1100, 1500 & 1700 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and facrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for as per section 1500, 1700&2200 of MORT&H specification (V Revision) for CAPPING BEAM OVER PIERS.
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and facrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, for PEDESTALS OVER PIERS AND ABUTMENTS as per section 1500, 1700 & 2200 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, vibration charges, working at at heights, soft water and hire charges for tools and plants, including all other incidental charges etc, complete as per relevant standard spectification for T-BEAMS and CROSS BEAMS as per section 1500,1700 & 2300 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS graded metal including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete as per sec 1500,1700 & 2300 of MORT&H specification (V Revision) for Deck slab.
Supplying and Fixing of ELASTOMERIC BEARING as shown in drawing including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges etc., complete as per section 2000 of MORT&H specification (V Revision).
Supplying and installation of STRIP SEAL EXPLASION joint system confirming to specifications for road and bridge works published by Ministry of Surface Transport (Road Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and diry wall over abutment with fatigue tested structual steel section at the nosing and anchorage assembly, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per specifications as per section2600 of MORT&H specificstion (V Revision)
Providing and fixing of G.I DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position, etc, complete as per el 2705 of MORT&H specification (V Revision)
Vibrated Reinforced CementConcrete M40 (Design mix) using 20 mm ISS graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing,transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for CRASH BARRIER as per sec 811, 1700 & 2703.3 of MORT&H specification ( V Revision).
Vibrated cement concrete M30 (Design mix) using 20mm,12mm, 6mm ISS HBG graded Metal, including cost and conveyance of all materials to work site including all leads for softwater, including all other incidental charges formwork, cost of premoulded expansion joints and fixing the same in position etc, complete for WEARING COAT OVER DECK SLAB AND APPROACH SLAB as per cl 2702.2 of MORT&H specification (V Revision).
Supply and fabrication of Fe-500 (HYSD) steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per sec 2706 of MORT&H specification (V Revision).
Supply and fabrication of Fe-240 steel required in the schedule including cost of steel at site cost of providing and cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills including lapping to the required length wherever necessary and providing to the reinforcement, placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc complete as per cl 2706 of MORT&H specification (V Revision).
Sub Total Amount for above all items
GST 18% for the above Sub Total Amount
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_794522.xls
BOQ • 0.27 MB
TenderDocNeedaBalance.pdf
Tender Documents • 0.68 MB
PQdocNeedaBalance.pdf
Tender Documents • 0.37 MB
Drawings.pdf
Additional Documents • 0.79 MB
Download all tender documents and submit your bid