Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹7.0 CrAdmitted-Finance | ₹7.0 Cr | H1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Tac. Rejected |
| Sl No | Description | Qty | Unit | M/s Raghavay Corporation H1 |
|---|---|---|---|---|
| 1.01 | 1. Design and build sewage treatment plant of installed capacity1.0 MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 0.44 Km length including survey, design, construction of 1 No. of Pumping stations and all appurtenant structures and allied works; and
3. Construction of Gravity main pipe (RCC NP3) along the river having length 310 m & Dia. 450 mm to 500 mm along with sufficient number of Manholes.
4. Providing and laying of 1 Km HT Feeder Connection upto Sewerage Treatment Plant/ Pumping Station.
5. Arrangement for Reuse of Treated Wastewater from STP | 1 | Lump-Sum | 2,93,35,488 ₹2.9 Cr |
| 1.02 | Operation and Maintenance Cost next 10 Years | 1 | Lump-Sum | - |
| 1.03 | 1st Year | 1 | Lump-Sum | 12,77,847 ₹12.8 L |
| 1.04 | 2nd Year | 1 | Lump-Sum | 13,54,518 ₹13.5 L |
| 1.05 | 3rd Year | 1 | Lump-Sum | 14,35,790 ₹14.4 L |
| 1.06 | 4th Year | 1 | Lump-Sum | 15,21,937 ₹15.2 L |
| 1.07 | 5th Year | 1 | Lump-Sum | 16,13,525 ₹16.1 L |
| 1.08 | 6th Year | 1 | Lump-Sum | 17,10,048 ₹17.1 L |
| 1.09 | 7th Year | 1 | Lump-Sum | 18,12,651 ₹18.1 L |
| 1.10 | 8th Year | 1 | Lump-Sum | 19,21,410 ₹19.2 L |
Tender Value
₹3.3 Cr
EMD Value
₹1.6 L
Closing Date
4 Mar 2026, 5:30 pmClosed
C.M.O. Nagar Parishad, Manjholi Dist. Jabalpur
C.M.O. Nagar Parishad, Manjholi Dist. Jabalpur
Interception And Diversion of Nallahs with STP works Project of Majholi town under SBM 2.0
2026_UAD_477891_1
1867/STP/2026
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
365 days
Work
AS PER NIT AND TENDER DETAILS
5 documents required · 5 mandatory
₹15,000
₹1.6 L
C.M.O. Nagar Parishad, Manjholi Dist. Jabalpur
15 May 2026
31 Jan 2026
5 Mar 2026
31 Jan 2026
4 Mar 2026
31 Jan 2026
9 Feb 2026
1. Design and build sewage treatment plant of installed capacity1.0 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 0.44 Km length including survey, design, construction of 1 No. of Pumping stations and all appurtenant structures and allied works; and 3. Construction of Gravity main pipe (RCC NP3) along the river having length 310 m & Dia. 450 mm to 500 mm along with sufficient number of Manholes. 4. Providing and laying of 1 Km HT Feeder Connection upto Sewerage Treatment Plant/ Pumping Station. 5. Arrangement for Reuse of Treated Wastewater from STP
Operation and Maintenance Cost next 10 Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B)
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Power Consuption @ 6.5 Rs per unit
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) ©
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
TDOC477891Majholi.pdf
Tender Documents • 1.52 MB
BOQ_563290.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid