Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.6 L+₹6,467.42 (4.22%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.0 L+₹43,227.54 (28.2%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.0 L+₹43,247.20 (28.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
11 May 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_309050_1
2ND TIME e-NIT No. 08 REW UDHAMPUR of 2026-27 Dated 29-04-2026
Open Tender
Civil Works
Percentage
30 days
XEW REW UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,920
18 May 2026
30 Apr 2026
12 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of sign board | 1 | No. | 2,000 | ₹2,000 |
| 2 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 3.71 | cum | 479.3 | ₹1,778.2 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 9.2 | cum | 4,826.5 | ₹44,403.8 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 4.93 | cum | 5,733.6 | ₹28,266.65 |
| 5 | Cetring and shuttering including strutting, propping etc and removal of the formwork. foundation, footing | 20 | Sqm | 286.35 | ₹5,727 |
| 6 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. 80 mm thick C.C. paver block of M-30 grade with approved
color design and pattern. | 107.8 | Sqm | 929.85 | ₹1,00,237.83 |
| 7 | Carriage of sand 50 km mt | 13.32 | Cum | 741.14 | ₹9,871.98 |
| 8 | Carriage of Bajri 10 KM MT | 4.43 | Cum | 279.04 | ₹1,236.15 |
| 9 | Carriage of stones 10 KM MT | 9.31 | Cum | 328.31 | ₹3,056.57 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_1000744.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .