Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
24 Aug 2026, 4:00 pmDue today
XEN REW Kathua
XEN REW Kathua
Construction of waiting shed at shamshan ghat at old salalpur Panchayat Korepunnu Block Marheen
2026_RDPR_321135_14
e-NIT No.186/REW/K of 2026-27 Dated 17/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
Marheen
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹5,880
17 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, A.K.O.S | 6.12 | Cum | 479.3 | ₹2,933.32 |
| 2 | Providing and laying in position cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:5:10(1 cement:5 coarse sand:10 garded stone 40 mm nominal size ] | 1.95 | cum | 4,826.2 | ₹9,411.09 |
| 3 | Providing and laying in position cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:3:6(1 cement:3 coarse sand:6 garded stone 20 mm nominal size ] | 4.76 | Cum | 5,733.6 | ₹27,291.94 |
| 4 | supply of stone | 2.04 | cum | 937.9 | ₹1,913.32 |
| 5 | half brick masonary with common burnt clay (non modular)bricks of class designation 7.5 in foundation and plinth | 13.94 | m2 | 947.25 | ₹13,204.66 |
| 6 | Providing and laying in position reinforce cement concrete of specified grade (M20) inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:1.5:3(1 cement: 1.5 coarse sand:3 garded stone 20 mm nominal size ] | 8.7 | Cum | 7,788.4 | ₹67,759.08 |
| 7 | Steel reinforcement for RCC work including starighting, cutting, bending , placing in position and binding all complete(TMT steel) | 870 | kg | 123.2 | ₹1,07,184 |
| 8 | Providing and laying 12 mm thick cement sand plaster in 1:6mix | 44 | sqm | 283.8 | ₹12,487.2 |
| 9 | White wash to give an even of required shade on New work (two or more colours coats) | 44 | Sqm | 38.6 | ₹1,698.4 |
| 11 | Foundations, footings, bases of columns etc. | 14.31 | Sqm | 286.35 | ₹4,097.67 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
BOQ_1071250.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].