Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3 LAccepted-AOC | ₹3 L Quoted ₹2.9 L | L1 | Accepted-AOC tender |
| 2 | L2₹3.2 LRejected-Finance | ₹3.2 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | T PANNEERSELVAM L2 | NKR INFRAA L1 |
|---|---|---|---|---|---|
| 1.00Rectification of Pot Holes to Old SR Pattinam Road in SR Pattinam Panchayat Km 0/0-1/200 | |||||
| 2.00Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete. | |||||
| 3.00 | Km 0/0-1/200 | 288 | Sq.m | 10 ₹2,880 | 6 ₹1,728 |
| 4.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | |||||
| 5.00 | Km 0/0-1/200 | 57.6 | Cu.m | 160 ₹9,216 | 140 ₹8,064 |
| 6.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | |||||
| 7.00 | Km 0/0-1/200 | 2.51 | Cu.m | 4,800 ₹12,048 | 4,787 ₹12,015.37 |
| 8.00Providing and laying TACK COAT over the Bt surface using3.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | |||||
| 9.00 | Km 0/0-1/200 | 604.24 | Sq.m | 50 ₹30,212 | 33 ₹19,939.92 |
| 10.00Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | |||||
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
17 Oct 2025, 3:00 pmClosed
BLOCK DEVELOPEMENT OFFICER (BP) SETHUBAVACHATRAM
BLOCK DEVELOPEMENT OFFICER (BP) SETHUBAVACHATRAM
Rectification of Pot Holes to Old Sarabendrarajapattinam Road in Sarabendrarajapattinam Panchayat KM 0/0-1/200
2025_RDTN_613676_1
2749/2025/A2
Open Tender
Civil Works - Others
180 days
SARABENDRARAJAPATTINAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹3,000
Yes
30 Dec 2025
13 Oct 2025
17 Oct 2025
13 Oct 2025
17 Oct 2025
13 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid