Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹3.4 L+₹520.41 (0.15%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | S.Ramasubramanian L1 | Lakshmanan T L2 |
|---|---|---|---|---|---|
| 1.00Construction of Compost pit at Kadayam Perumpathu Village and Panchayat,Kadayam Panchayat Union Under SBM (G) - 2026 - 2027 | |||||
| 2.00 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete. | 28.62 | cum | 260 ₹7,441.2 Lowest | 263 ₹7,527.06 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 8.13 | cum | 5,358 ₹43,560.54 Lowest | 5,359 ₹43,568.67 |
| 4.00 | Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete for core wall. | 82.08 | sqm | 547 ₹44,897.76 Lowest | 547.5 ₹44,938.8 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 7.13 | cum | 6,110 ₹43,564.3 Lowest | 6,111 ₹43,571.43 |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 5.66 | cum | 6,650 ₹37,639 Lowest | 6,651 ₹37,644.66 |
| 7.00Fencing arrangements:- | |||||
| 8.00 | Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete. | 5.83 | Cum | 260 ₹1,515.8 Lowest | 263 ₹1,533.29 |
| 9.00 | Supply and Delivery of 50mm GI Pipe for Vertical post for fencing work including cost and conveyance all labour charges etc complete. | 120 | Mtr | 472 ₹56,640 Lowest | 473 ₹56,760 |
| 10.00 | Supply and Delivery of Barbed wire using 10Gauage two Play and four Proposed gaivanish iron wire of all size including cost and conveyance all labour charges etc complete. | 360 | 6Mtr | 10.2 ₹3,672 Lowest | 10.35 ₹3,726 |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
22 Sept 2026, 3:00 pmClosed
Block Development officer,V.Pt
Block Development Officer( V.Pt), Panchayat Union, Kadayam.
Construction of Compost pit at Kadayam Perumpathu Village and Panchayat.
2026_RDTN_701137_6
BDKDM/370/2026-B2
Open Tender
Civil Works - Buildings
Works
Kadayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,500
28 Sept 2026
3 Sept 2026
22 Sept 2026
3 Sept 2026
22 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Compost pit at Kadayam Perumpathu Village and Panchayat,Kadayam Panchayat Union Under SBM (G) - 2026 - 2027 | - | - | - | - |
| 2 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete. | 28.62 | cum | 263.78 | ₹7,549.38 |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 8.13 | cum | 5,359.62 | ₹43,573.71 |
| 4 | Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete for core wall. | 82.08 | sqm | 547.5 | ₹44,938.8 |
| 5 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 7.13 | cum | 6,111.06 | ₹43,571.86 |
| 6 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 5.66 | cum | 6,651.86 | ₹37,649.53 |
| 7 | Fencing arrangements:- | - | - | - | - |
| 8 | Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete. | 5.83 | Cum | 263.78 | ₹1,537.84 |
| 9 | Supply and Delivery of 50mm GI Pipe for Vertical post for fencing work including cost and conveyance all labour charges etc complete. | 120 | Mtr | 473.6 | ₹56,832 |
| 10 | Supply and Delivery of Barbed wire using 10Gauage two Play and four Proposed gaivanish iron wire of all size including cost and conveyance all labour charges etc complete. | 360 | 6Mtr | 10.35 | ₹3,726 |
stage.html
html • 0.02 MB
finance_842818.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_842818.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .