Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Finance | Not Admitted-Finance Not qualified for AOC |
| 2 | Not Admitted-Finance | Not Admitted-Finance Others-technical error |
| 3 | Not Admitted-Finance | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹24.3 L
EMD Value
₹48,560
Closing Date
4 May 2026, 6:00 pmClosed
Executive Enigneer
pwd division udhampur
Motorable Bridge on the road from PWD Dak Bunglow Ghordi Panchayat Gordhi Khass Via Neeli Nallah (by way of Construction of Retaining Wall)
2026_PWDJK_308828_2
e-NIT No. 18 of 2026-27 Dated 27.04.2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Division Udhampur
₹48,560
6 May 2026
27 Apr 2026
5 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil : | 222.03 | cum | 592.9 | ₹1,31,641.59 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | cum | 4,826.5 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% Boulders | 111.61 | cum | 4,774.46 | ₹5,32,877.48 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% Boulders | 73.36 | cum | 6,239.42 | ₹4,57,723.85 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone Nallah | 142.97 | cum | 3,262.1 | ₹4,66,382.44 |
| 6 | Dumping stones including cost and supply of stones in horizontal on level | 62.46 | cum | 937.9 | ₹58,581.23 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 172.44 | cum | 218.4 | ₹37,660.9 |
| 8Centering and shuttering including strutting, propping etc and removal of the formwork. | |||||
| 8.1 | Foundations, footings, bases for columns | 108.62 | Sqm | 286.35 | ₹31,103.34 |
| 8.2 | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 336.82 | Sqm | 628.95 | ₹2,11,842.94 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_1000374.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .