Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical MAPMC MUMBAI | MUMBAI | MAHARASHTRA | 400001 | Accepted-Technical Technically qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically qualified |
| 3 | Accepted-Technical 2 105 A THELAPUR ARUNODAY APARTMENT NL 6 7 2 SEC 8 PHASE 2 NERUL WEST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | Accepted-Technical Technically qualified |
| 4 | Rejected-Technical | Rejected-Technical Technically disqualified |
Tender Value
₹2.9 Cr
EMD Value
₹1.5 L
Closing Date
13 Apr 2026, 3:00 pmClosed
Executive Engineer Belapur NMMC
Head Office NMMC
(93564)Desilting and Pitching of Nallah by Plum Concrete at 19/20, Shahbaaz-Belapur Gaon in CBD- Belapur Ward.
2026_NMMC_1288988_1
NMMC/CE/494/2025-2026
Open Tender
Civil Works
Percentage
270 days
Executive Engineer Belapur NMMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹1.5 L
18 Aug 2026
24 Mar 2026
15 Apr 2026
24 Mar 2026
13 Apr 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | (93564)Desilting & Pitching of Nallah by Plum Concrete at 19/20, Shahbaaz-Belapur Gaon in CBD- Belapur Ward. | - | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendercopy.pdf
Tender Documents • 1.35 MB
BOQ_2216080.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .