| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹5.4 L−₹12,193.45 (2.19%)Accepted-AOC | ₹5.4 L−₹12,193.45 (2.19%) | H2 | Accepted-AOC Lowest Amount Quoted |
| 2 | H1₹5.6 LRejected-Finance | ₹5.6 L | H1 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | V GUNASEKARAN H1 | PANDIYAN V H2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils with initial lead of 10m and lift of 2m bailing water wherever necessary and refilling the sides of foundation with excavated earth etc. complete as per standard specification | 104.65 | m3 | 190 ₹19,883.5 | 184 ₹19,255.6 Lowest |
| 2.00 | Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. | 14.95 | m3 | 5,700 ₹85,215 | 5,627 ₹84,123.65 Lowest |
| 3.00 | Centering for sides and sofilts for PCC work drinage and sidewall surfaces below 3m height including strutting arrangements as per standard specification and removing the same after the specified period and including cost of all other inciden | 276 | m2 | 520 ₹1,43,520 | 494 ₹1,36,344 Lowest |
| 4.00 | Cement Concrete 1: 2 : 4 mix (One part cement, Two part of sand and Four part of agrrigate) using 20mm size HBG metal from approved quary including cost and convayance of all material to site loading and unloading charges and labour charges mixing. Laying and curing etc. complete. Complying with standard specifications. | 41.4 | m3 | 7,125 ₹2,94,975 | 7,077 ₹2,92,987.8 Lowest |
| 5.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 69 | m2 | 190 ₹13,110 | 171 ₹11,799 Lowest |
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
18 Aug 2025, 3:00 pmClosed
Executive officer
Executive officer Karambakkudi Townpanchayat
Construction of Storm Water Drainage at Ward No.5, Thattavurani in Karambakkudi Town Panchayat
2025_DTP_592045_1
638/2025
Open Tender
Civil Works
Works
Karambakkdui Townpanchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,500
Yes
19 Aug 2025
12 Aug 2025
18 Aug 2025
12 Aug 2025
18 Aug 2025
12 Aug 2025
Amount
Earthwork excavation for foundation in all soils with initial lead of 10m and lift of 2m bailing water wherever necessary and refilling the sides of foundation with excavated earth etc. complete as per standard specification
Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.
Centering for sides and sofilts for PCC work drinage and sidewall surfaces below 3m height including strutting arrangements as per standard specification and removing the same after the specified period and including cost of all other inciden
Cement Concrete 1: 2 : 4 mix (One part cement, Two part of sand and Four part of agrrigate) using 20mm size HBG metal from approved quary including cost and convayance of all material to site loading and unloading charges and labour charges mixing. Laying and curing etc. complete. Complying with standard specifications.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
PANDIYAN V (BID ID -1429552)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .