Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | ₹7.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.0 LAdmitted-Finance | ₹8.0 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-withdraw the Contractor |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-withdraw the Contractor |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-withdraw the Contractor |
| Sl No | Description | Qty | Unit | A VADIVEL L1 | SIVARANJANI CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Construction of Vertical Soak Pit 5 Nos @ Sri Lankan Refugee Camp Thoppukkollai in Thiruvarankulam Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 299.5 | Cum | 263.5 ₹78,918.25 | 270 ₹80,865 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm gauge hand broken granite tone jelly for foundation including all charges compacted,etc., complete | 3.65 | Cum | 5,577 ₹20,356.05 | 5,586.5 ₹20,390.73 |
| 4.00 | Cement concrete 1:2:4 mix using 20mm gauge hand broken granite tone jelly for foundation including all charges compacted,etc., complete | 13.25 | Cum | 6,968 ₹92,326 | 6,975 ₹92,418.75 |
| 5.00 | Centering for sides and sofits for all RCC items including including cost and conveyance of all materials to work site and all labour charges etc.complete | 115.2 | Sqm | 547.5 ₹63,072 | 575 ₹66,240 |
| 6.00 | Supply and filling of 225 mm metal from approvaed quarry including cost and conveyance of all meterials to site and all labour charges etc complete | 97.5 | Cum | 385 ₹37,537.50 | 390 ₹38,025 |
| 7.00 | Supply and filling of 40 mm metal from approvaed quarry including cost and conveyance of all meterials to site and all labour charges etc complete | 109.65 | Cum | 1,607.5 ₹1.8 L | 1,628 ₹1.8 L |
| 8.00 | Supply and filling of 20mm metal from approvaed quarry including cost and conveyance of all meterials to site and all labour charges etc complete | 74.05 | Cum | 2,142 ₹1.6 L | 2,150 ₹1.6 L |
| 9.00 | Supplying and Fixing 900mm Dia RCC rings etc completed., | 25 | RM | 750 ₹18,750 | 775 ₹19,375 |
| 10.00 | Supplying and Fixing 900mm Dia RCC cover Slab etc completed., | 10 | RM | 500 ₹5,000 | 520 ₹5,200 |
Tender Value
₹8.3 L
EMD Value
₹8,250
Closing Date
13 Mar 2026, 3:00 pmClosed
BDO, Thiruvarankulam
Pt. Union office, Thiruvarankulam
Construction of Vertical Soakpit 5 Nos at SriLankan Refugee Camp Thoppukkollai in Thiruvarankulam Panchayat.
2026_RDTN_672231_1
Tvk/PUGF/SrilanganCamp/Work-12
Open Tender
Civil Works
Thiruvarankulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,250
11 May 2026
9 Mar 2026
13 Mar 2026
9 Mar 2026
13 Mar 2026
9 Mar 2026
Construction of Vertical Soak Pit 5 Nos @ Sri Lankan Refugee Camp Thoppukkollai in Thiruvarankulam Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm gauge hand broken granite tone jelly for foundation including all charges compacted,etc., complete
Cement concrete 1:2:4 mix using 20mm gauge hand broken granite tone jelly for foundation including all charges compacted,etc., complete
Centering for sides and sofits for all RCC items including including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and filling of 225 mm metal from approvaed quarry including cost and conveyance of all meterials to site and all labour charges etc complete
Supply and filling of 40 mm metal from approvaed quarry including cost and conveyance of all meterials to site and all labour charges etc complete
Supply and filling of 20mm metal from approvaed quarry including cost and conveyance of all meterials to site and all labour charges etc complete
Supplying and Fixing 900mm Dia RCC rings etc completed.,
Supplying and Fixing 900mm Dia RCC cover Slab etc completed.,
Supply and filling of Red Gravel from approvaed quarry including cost and conveyance of all meterials to site and all labour charges etc complete
Supply and filling of char coal from approvaed quarry including cost and conveyance of all meterials to site and all labour charges etc complete
Supply of PVC pipes160 mm dia including necessary joints for inspection chamber to the soak pit etc
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 13 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tvk_doc--12.pdf
Tender Documents • 0.18 MB
BOQ_807900.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid