| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.2 LAccepted-AOC SIDDHARTH NAGAR | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.8 L+₹60,279.55 (2.22%)Rejected-Finance SHRI RAM VILA UDAI SINGH JAIN RAOD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L2 | Rejected-Finance L2 | |
| 3 | L3₹28.7 L+₹1.5 L (5.39%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹35.2 L
EMD Value
₹71,000
Closing Date
27 Mar 2024, 1:00 pmClosed
S. E, Irrigation Construction Circle Basti
S. E, Irrigation Construction Circle Basti
Contructions (Balance work) of V.R.B (Box Culvert) at Km 66.700 of Khalilabad Branch Canal.
2024_UPIDC_914905_3
08/S.E/2023-24
Open Tender
Civil Works
Item Wise
150 days
Khalilabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,416
₹71,000
3 Oct 2024
16 Mar 2024
27 Mar 2024
16 Mar 2024
27 Mar 2024
16 Mar 2024
Amount
E/W in excavation of foundation i/c digging & refilling the trenches with its proper disposal
Centering & shuttering for P.C.C of Raft and Toe Wall i/c cost of all, material labour T&P etc complete
Laying M-15 (1:2:4) PCC in foundation with crushed stone grit 4.75 mm- 20.00 mm size and chopan coarse sand and i/c cost of all, material labour T&P etc complete.
Laying M-20 (1:1.5:3) CC in Toe wall with crushed stone grit 4.75 mm- 20.00 mm size and chopan coarse sand and i/c cost of all, material labour T&P etc complete.
Centering & shuttering for R.C.C raft slab & Abutment and Pier i/c cost of all, material labour T&P etc complete.
Laying M-25 RCC in Abutment, Pier, Slab, Hunch, Parapet & Retaining wall with crushed stone grit 4.75 mm- 20.00 mm size and chopan coarse sand and i/c cost of all, material labour T&P etc complete.
Laying M-30 CC in wearing coat with crushed stone grit 4.75 mm- 20.00 mm size and chopan coarse sand and i/c cost of all, material labour T&P etc complete.
Cutting, bending & binding of steel with placing i/c cost of all, material labour T&P etc complete
Laying & fixing of joint filler board 20 mm Thick of thermacoal as specified locations i/c cost of all, material labour T&P etc complete
Supplying & Laying Filter with crushed stone grit 10.00mm-20.00 mm size and chopan corse sand and i/c cost of all material labour T&P etc complete.
Laying Filter with crushed stone grit 20.00mm-40.00 mm size and i/c cost of all, material labour T&P etc complete.
Supplying & Laying Filter with Coarse Sand size and i/c cost of all, material labour T&P etc complete.
Supplying & fixing of P.V.C. water Stop seal 10mm i/c cost of all, material labour T&P etc complete
Supplying & fixing of P.V.C. Drainge spout pipe i/c cost of all, material labour T&P etc complete
Laying Stone Boulder 20-40 mm in pitching i/c cost of all, material labour T&P etc complete
M/S AMIT TRADERS
M/S JEET CONSTRUCTION COMPANY
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .