| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | ₹10.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.9 L−₹109 (0.01%)Rejected-Finance | ₹10.9 L−₹109 (0.01%) | L2 | Rejected-Finance Higher Rate Quoted |
Tender Value
₹10.9 L
EMD Value
₹22,000
Closing Date
22 Jul 2026, 12:00 pmClosed
EE RED Sitapur
Vikas Bhawan, Sitapur
Construction of Late Hargovind Verma and Late Chandrakali Verma gates on Kasraila bridge, Block Parsendi
2026_REDUP_1169964_16
522/RED/Tender/2026-27
Open Tender
Civil Works
Percentage
90 days
Parsendi
Please refer Tender documents.
2 documents required · 2 mandatory
₹857
₹22,000
17 Sept 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
22 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation by mechanical means/manual means in foundation and trenches or drains excavates soil and disposal of surplus excavates soil as directed within a lead on 50 m. and lift upto 1.5 m. etc. all complete | 15.87 | Cum | 1 | ₹15.85 |
| 2 | Extra for the every additional lift 1.5 m. or part there of in excavation/banking excavated or stacked materials etc. all kind of soil etc. all complete | 10.05 | Cum | 1 | ₹10.04 |
| 3 | Providing and Laying cement concrete 1:4:8 with cement, coarse sand and 40 mm stone ballast including supply of all the materials, labour and T & P etc. all complete | 3.17 | Cum | - | - |
| 4 | Providing and Laying reinforced cement concrete 1:1.5:3 with cement, coarse sand and 20 mm stone grit including and supply of all the materials, labour and T & P etc. all complete | 6.48 | Cum | - | - |
| 5 | Centering and Shuttering including strutting, propping etc. removal of work for foundation, footing bases for columns etc. all complete | 17.8 | Sqm | 1 | ₹17.78 |
| 6 | Mild Steel or Iron Work in reinforcement including cutting, bending and binding etc. all complete | 5.09 | Qtls. | 1 | ₹5.08 |
| 7 | Providing and Fixing of Hand Rail of the approved size by welding etc. with G.I. Pipes and including supply of all the materials, labour and T & P etc. all complete | 18.66 | Qtls. | - | - |
| 8 | Structural Steel Work riveted bolted or welded in built up section trusses and fraed work including cutting, hoisting fixing in position and applying a priming coat of approved steel primer etc. all complete | 3.2 | Qtls. | - | - |
| 9 | Cane Charge for hoisting vertical column in position with derivel and stoff for vehical post etc. all complete | 2 | Days | - | - |
| 10 | 15 mm thick plaster in 1:3 with cement and coarse sand mortar including supply of all materials, labour and T & P etc. all complete | 8.64 | Sqm | 1 | ₹8.63 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
SBD522.pdf
Tender Documents • 3.88 MB
BOQ_2195469.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .