Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
12 Aug 2026, 11:00 am
Regional Officer, Raipur
NHAI Regional Office Raipur C.G.
Supply, Installation, Testing, Commissioning, Operation , Maintenance of Centralized Control and Monitoring System CCMS for Street Lighting on highways under RO Raipur in the State of CG including Five (05) Years of Operation and Mainten
2026_NHAI_285104_1
NHAI/RO-RPR/CCMS/26
Open Tender
Electrical Works
Item Rate
1945 days
Under jurdiction of RO Raipur
As per RFP
4 documents required · 4 mandatory
₹25,000
GM NHAI
₹5 L
Yes
22 Jul 2026
22 Jul 2026
13 Aug 2026
22 Jul 2026
12 Aug 2026
22 Jul 2026
22 Jul 2026 - 30 Jul 2026
Name of work: Supply, Installation, Testing, Commissioning, Operation & Maintenance of Centralized Control & Monitoring System (CCMS) for Street Lighting on highways under RO-Raipur in the State of Chhattisgarh including Five (05) Years of Operation & Maintenance.
Time Period: - 64 Months (04 Months Installation + 60 Months O&M)
Name of the Contractor
Sr.No. Name of work Unit Quantity Quoted Rate Quoted Cost (Rs.)
1 Supply, Installation, Testing & Commissioning of Centralized Control & Monitoring System (CCMS) conforming to the Technical Specifications of the RFP under Section-IV (Technical Bid), including but not limited to: a) CCMS Feeder Panel (3-Phase) with enclosure Size 850*750*250, pole-mounted or ground/stand-mounted, and accessories etc. b) CCMS Controller / RTU / Gateway with GPRS/GSM communication c) 3-Phase DLMS/ Modbus compliant Energy Meter d) Protection devices (MCCB/MCB/ELCB/SPD, relays, contactors, etc.) e) Antenna, wiring, earthing, and all hardware accessories f) Web-based Central Control & Monitoring Software Per CCMS 460 0.00
Total Cost (Excl. GST) (In Words)
Note: - 1. Operation & Maintenance (O&M) of CCMS, including software support, server/cloud hosting, SIM/data connectivity, batteries, consumables, spares, preventive & breakdown maintenance, fault rectification, and reporting, complete in all respects, shall be payable at the rate of 12.5 % of the accepted CCMS supply and installation cost per feeder panel per year, applicable after completion of the first year of the O&M phase (DLP period), for the remaining 4 years of the 60-month O&M period
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
RFP.pdf
Tender Documents • 1.28 MB
Financial Bid.xlsx
Other Document • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].