Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 CrAccepted-Finance | ₹2.1 Cr | 1 | Accepted-Finance lowest |
| 2 | 2₹2.2 CrRejected-Finance HOUSE NO 195 3 NAIKWADA CANCA BARDEZ GOA | ₹2.2 Cr | 2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | I B CONSTRUCTIONS L2 | M/s IJM Construction L1 |
|---|---|---|---|---|---|
| 1.00CIVIL | |||||
| 1.01 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 6 | 100 Sqm | 500 ₹3,000 | 500 ₹3,000 |
| 1.02 | Earthwork in excavation over areas by mechanical/manual means in all type of strata upto a depth of 3 meters comprising any of the materials such as soil, silt, sand, clay, gravels, moorum of all varieties, shingles, pebbles, all types of conglomerates, all types of laterite rock, soft rock, disintegrated rock, fissured/ shattered/ decomposed rock or weathered rock and all such other materials as described under appendix to these specifications whether in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc.blasting prohibited including pumping or bailing out water including segregating the excavated earth/rock and disposal of surplus excavated earth at contractors identified site(at risk and cost of the contractor)for all leads and lifts and as directed by Engineer . | 491 | Cu.m. | 450 ₹2.2 L | 450 ₹2.2 L |
| 1.03 | Earthwork in excavation for foundation pipeline trenches by mechanical/mannual means in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravels, moorum of all varieties, shingles, pebbles, all types of conglomerates, all types of laterite rock, soft rock, disintegrated rock, fissured/ shattered/ decomposed rock or weathered rock and all such other materials as described under appendix to these specifications whether in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. blasting prohibited including pumping or bailing out water including segregating the excavated earth/rock and disposal of surplus excavated earth at contractors identified site at risk and cost of the contractor) for all leads and lifts and as directed by Engineer . | 121 | Cu.m. | 450 ₹54,450 | 450 ₹54,450 |
| 1.04 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers (excluding rock) not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer. | 262 | Cu.m. | 250 ₹65,500 | 250 ₹65,500 |
| 1.05 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 217 | Cu.m. | 2,000 ₹4.3 L | 2,200 ₹4.8 L |
| 1.06 | Pre-cast cement concrete solid blocks masonry of compressive strength 70 kg / cm2 in cement mortar 1:4 (1 cement : 4 corase sand ) in partition walls size of blocks (30 x 20 x 10) | 32 | Sqm | 800 ₹25,600 | 1,000 ₹32,000 |
| 1.07 | Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in c.m. 1 : 4 (1 cement : 4 coarse sand in foundation upto plinth level | 81 | Cu.m. | 7,000 ₹5.7 L | 6,500 ₹5.3 L |
| 1.08 | Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in c.m. 1 : 4 (1 cement : 4 coarse sand in foundation upto plinth level
Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 46 | Cu.m. | 7,000 ₹3.2 L | 6,700 ₹3.1 L |
| 1.09 | Providing and fixing Exposed laterite cladding 75mm thick with Patradevi laterite stone on concrete pillars as shown in the drawings, including 12mm cement plaster on concrete surface 1:3 (1cement 3: fine sand), chamfering the edges, filling the joints with matching colour pigments, including polishing the same with non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by the engineer, etc complete. | 162 | Sqm | 4,000 ₹6.5 L | 4,200 ₹6.8 L |
Tender Value
Refer Docs
EMD Value
₹4.0 L
Closing Date
20 Apr 2026, 3:00 pmClosed
Executive Engineer
4th Floor Paryatan Bhavan
Upgradation beautification of surrounding of Shree Sateri Devasthan Chandel in Pernem Taluka
2026_GTDCL_28632_1
GTDC/PC/EE(N)/2026-27/e-07
Open Tender
Civil Works
180 days
Paryatan Bhavan
Please refer Tender documents.
8 documents required · 8 mandatory
₹15,000
₹4.0 L
1 Jun 2026
11 Apr 2026
22 Apr 2026
11 Apr 2026
20 Apr 2026
11 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL | - | - | - | - |
Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | - | 100 Sqm | - | - | |
Earthwork in excavation over areas by mechanical/manual means in all type of strata upto a depth of 3 meters comprising any of the materials such as soil, silt, sand, clay, gravels, moorum of all varieties, shingles, pebbles, all types of conglomerates, all types of laterite rock, soft rock, disintegrated rock, fissured/ shattered/ decomposed rock or weathered rock and all such other materials as described under appendix to these specifications whether in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc.blasting prohibited including pumping or bailing out water including segregating the excavated earth/rock and disposal of surplus excavated earth at contractors identified site(at risk and cost of the contractor)for all leads and lifts and as directed by Engineer . | - | Cu.m. | - | - | |
Earthwork in excavation for foundation pipeline trenches by mechanical/mannual means in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravels, moorum of all varieties, shingles, pebbles, all types of conglomerates, all types of laterite rock, soft rock, disintegrated rock, fissured/ shattered/ decomposed rock or weathered rock and all such other materials as described under appendix to these specifications whether in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. blasting prohibited including pumping or bailing out water including segregating the excavated earth/rock and disposal of surplus excavated earth at contractors identified site at risk and cost of the contractor) for all leads and lifts and as directed by Engineer . | - | Cu.m. | - | - | |
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers (excluding rock) not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer. | - | Cu.m. | - | - | |
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | - | Cu.m. | - | - | |
Pre-cast cement concrete solid blocks masonry of compressive strength 70 kg / cm2 in cement mortar 1:4 (1 cement : 4 corase sand ) in partition walls size of blocks (30 x 20 x 10) | - | Sqm | - | - | |
Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in c.m. 1 : 4 (1 cement : 4 coarse sand in foundation upto plinth level | - | Cu.m. | - | - | |
Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in c.m. 1 : 4 (1 cement : 4 coarse sand in foundation upto plinth level
Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | - | Cu.m. | - | - | |
Providing and fixing Exposed laterite cladding 75mm thick with Patradevi laterite stone on concrete pillars as shown in the drawings, including 12mm cement plaster on concrete surface 1:3 (1cement 3: fine sand), chamfering the edges, filling the joints with matching colour pigments, including polishing the same with non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by the engineer, etc complete. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 0.63 MB
Tendernotice_3.pdf
PDF • 0.61 MB
Tendernotice_4.pdf
PDF • 0.42 MB
Tendernotice_5.pdf
PDF • 1.55 MB
Tendernotice_6.pdf
PDF • 0.40 MB
Tendernotice_7.pdf
PDF • 1.03 MB
BOQ_29071.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid