| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹16.6 L (15.3%)Admitted-Finance | ₹1.3 Cr+₹16.6 L (15.3%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | C Lalhluna L1 | PETER LALDINGNGHETA L2 |
|---|---|---|---|---|---|
| 1.10 | Clearing road side vegetation, brush wood mooli bamboos, overgrown grass including removal etc. along existing road side, and disposal of the cut bushes down hill side of the road formation.
This jungle clearance should includes minimum height of Clearance of 4.5m from top of pavement on uphill side of the road including road shoulder and all the bushes on the shoulder and down hill side of the road | 96 | Km | - | - |
| 1.20 | Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.) | 192 | sqm | - | - |
| 1.30 | Filling Pot-holes with WBM Materials (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including , hand packing, rolling, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. | 216 | Cum | - | - |
| 1.40 | Filling Pot- holes and Patch Repairs with Bituminous concrete, 40mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2)
(i) for grading I Material | 1,000 | Sqm | - | - |
| 1.50 | Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually) | 96,000 | Rm | - | - |
| 1.60 | Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side) | 3,000 | Cum | - | - |
| 1.70 | Providing and constructing temporary restoration work with form of a palasiding with empty bags filled with approved quality earth/sand/moorum/gravel etc. including stitching the bags with jute string and placing the filled up bags in popuslope to withstand the road structure temporarily from sliding down. | 2,000 | Cum | - | - |
| 1.80 | Carriage of all types of Material | 1 | LS | - | - |
Tender Value
₹1.4 Cr
Closing Date
15 Jun 2020, 2:00 pmClosed
ED(P) RO Aizawl
Regional Office-Aizawl, 3rd Floor, T-86, Tuikhuahtlang, Aizawl, Mizoram-796001
Ordinary repair of existing NH-302 (Hrangchalkawn- Lunglei-Lungsen-Tlabung) in the state of Mizoram on item Rate basis (2nd call)
2020_NHIDC_562212_1
NHIDCL/RO-Aizawl/Maint/LT/01
Open Tender
Civil Works
Item Rate
120 days
mizoram
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Yes
GM NHIDCL
Exempted
RO Aizawl
7 Jul 2020
2 Jun 2020
16 Jun 2020
2 Jun 2020
15 Jun 2020
10 Jun 2020
2 Jun 2020 - 9 Jun 2020
9 Jun 2020
Amount
Clearing road side vegetation, brush wood mooli bamboos, overgrown grass including removal etc. along existing road side, and disposal of the cut bushes down hill side of the road formation. This jungle clearance should includes minimum height of Clearance of 4.5m from top of pavement on uphill side of the road including road shoulder and all the bushes on the shoulder and down hill side of the road
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)
Filling Pot-holes with WBM Materials (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including , hand packing, rolling, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.
Filling Pot- holes and Patch Repairs with Bituminous concrete, 40mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2) (i) for grading I Material
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)
Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side)
Providing and constructing temporary restoration work with form of a palasiding with empty bags filled with approved quality earth/sand/moorum/gravel etc. including stitching the bags with jute string and placing the filled up bags in popuslope to withstand the road structure temporarily from sliding down.
Carriage of all types of Material
PETER LALDINGNGHETA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
Tendernotice_2.pdf
PDF • 0.40 MB
RFPLT.pdf
Tender Documents • 2.34 MB
NITLT.pdf
Additional Documents • 0.38 MB
BOQ_589993.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .