Loading…
Loading…
Tender Value
₹8.2 L
EMD Value
₹16,300
Closing Date
10 Aug 2026, 6:00 pmClosed
Exivutive Officer
Municipal Board Bagru
Construction of Room in govt School kudiwalo ki dhani in Nagar Palika Bagru
2026_DLB_581243_2
Nit 394 work 4 (38) in np bagru
Open Tender
Civil Works
Percentage
30 days
np_bagru
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Officer
₹16,300
Yes
3 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etcDepth upto 1.5 m wall, Footing | 1 | cum | 229.5 | ₹229.27 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size Wall, Footing, Footing | - | cum | 4,575 | - |
| 3 | Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse sand) Step 1st Step 2nd, Step 3rd | - | cum | 4,860 | - |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size). Footing, Column, Dpc lintel Beam, slab | 1 | cum | 7,380 | ₹7,372.62 |
| 5 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts Footing, Column, Dpc lintel Beam, slab | 1 | sqm | 375 | ₹374.63 |
| 6 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars. | - | kg | 83.3 | - |
| 7 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand) | - | cum | 6,500 | - |
| 8 | Random rubble dry stone Kharanja (soling) under floor. | - | cum | 2,270 | - |
| 9 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 15 mm cement plaster on the rough side of single or half brick wall of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. 1:6 (1 cem ent : 6 fine/ coarse sand). 1:6 (1 cement : 6 fine/ coarse sand) | - | sqm | 247 | - |
| 10 | Wire gauge SS wire gauge 14 mesh x 24 gauge | 1 | sqm | 1,458 | ₹1,456.54 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
BOQ_1032874.xls
BOQ • 0.25 MB
2.pdf
Tender Documents • 4.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .