Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | L1 | Accepted-AOC deed Complete | |
| 2 | L2₹8.9 L+₹55,012.57 (6.60%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-wrong A/F |
Tender Value
₹8.5 L
EMD Value
₹84,635
Closing Date
30 Jul 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Repair work on the damaged arched drain located opposite 109/408 and 110/241 Nehru Nagar, and 111/399 Ashok Nagar, within Ashok Nagar Ward-37 Zone- 04.
2026_NNKAN_1172276_1
205/AA-4/26-27
Open Tender
Civil Works
Percentage
45 days
ward-37
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹84,635
15 Oct 2026
25 Jul 2026
30 Jul 2026
25 Jul 2026
30 Jul 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalllng of B.O.E soling/Inter locking tiles Including Stacking of servicable direction of EI/C (Labour only)material and disposal Dismentalllng of B.O.E soling/Inter locking tiles Including Stacking of servicable direction of EI/C (Labour only)material and disposal of unservicable material within a lead of 50m as per | 37.2 | sqm | 11 | ₹409.2 |
| 2 | Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet) | 24.96 | sqm | 67 | ₹1,672.32 |
| 3 | Scraping of tar road including refusal of dismantled material up to 60.0mtr distance as per directed by engg-incharge. Null | 12 | sqm | 18 | ₹216 |
| 4 | E/W in Excavation in trenches for foundation pipe cable etc in ordinary soil (loan clay or sand ) including 1.5left and 50m and dressing Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of SO m.lncluding dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. | 84.24 | cum | 215 | ₹18,111.6 |
| 5 | Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 1.50-3.00Rmt) Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 1.50-3.00Rmt) | 84.24 | cum | 269 | ₹22,660.56 |
| 6 | Concrete/R.C.C. Work-Providing and laying In position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 cement : 4 coarse sand (zone-Ill): 8 graded Brick aggregate 40 mm (nominal size) | - | cum | 5,220 | - |
| 7 | Providing and laying and jointing of 300mm dia RCC NP-2 hume pipe with all complete Providing and laying and jointing of 300mm dia RCC NP-2 hume pipe with all complete | 26.4 | rmt | 771.1 | ₹20,357.04 |
| 8 | Class-150 brick work in 1:4 cement, c. sand in foundation and pilnth etc all complete. Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plllinth in. Cement mortar 1:4 (1 cement : 4 coarse sand) | 4.9 | cum | 6,600 | ₹32,340 |
| 9 | RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft foundation with 1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) Reinforced cement concrete work In beams, suspended floors, roofs having slope up to 15• landlngs, balconies, shelves, chaDas, lintels, bands, plaln window sllls, staircases and splral stair cases above pllnth level up to floor five level, excluding the cost of centering, shuttering, finishing andreinforcement | 4.69 | cum | 8,720 | ₹40,896.8 |
| 10 | Retaining walls, return walls, walls (any thickness) Including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. Centering and shuttering including strutting, propping etc. and removal of form work for (Upto 5th Floor) | - | sqm | 390 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2201580.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.19 MB
BOQ_2201580.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .