| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 LAdmitted-Finance | ₹26.9 L | L1 | Admitted-Finance |
| 2 | L2₹26.9 LAdmitted-Finance | ₹26.9 L | L2 | Admitted-Finance |
| 3 | L2₹26.9 LAdmitted-Finance | ₹26.9 L | L2 | Admitted-Finance |
| 4 | L2₹26.9 LAdmitted-Finance | ₹26.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DULU SAIKIA L1 | protul duarah L2 | RAJ BORUAH L2 | AMITABH BORDOLOI L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 44.08 | cum | 6,585.87 ₹2.9 L | 7,000 ₹3.1 L | 6,585.87 ₹2.9 L | 6,585.87 ₹2.9 L |
| 2.00 | ement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix 1:4 (1 cement: 4 fine sand) | 271.56 | Rm | 388.63 ₹1.1 L | 165 ₹44,807.40 | 388.63 ₹1.1 L | 388.63 ₹1.1 L |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 277.2 | LS | 294.7 ₹81,690.84 | 300 ₹83,160 | 294.7 ₹81,690.84 | 294.7 ₹81,690.84 |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars | 4,554.42 | cum | 85.12 ₹3.9 L | 85 ₹3.9 L | 85.12 ₹3.9 L | 85.12 ₹3.9 L |
| 5.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral staircases above plinth level up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand incuding manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 20%: 3 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) upto 20%) | 49.96 | sqm | 10,258.05 ₹5.1 L | 9,500 ₹4.7 L | 10,258.05 ₹5.1 L | 10,258.05 ₹5.1 L |
| 6.00 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade | 75.64 | cum | 183.17 ₹13,854.98 | 180 ₹13,615.20 | 183.17 ₹13,854.98 | 183.17 ₹13,854.98 |
| 7.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge | 5.1 | MT | 2,802.11 ₹14,290.76 | 2,200 ₹11,220 | 2,802.11 ₹14,290.76 | 2,802.11 ₹14,290.76 |
| 8.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 16.65 | cum | 1,625.36 ₹27,062.24 | 1,500 ₹24,975 | 1,625.36 ₹27,062.24 | 1,625.36 ₹27,062.24 |
| 9.00 | Cost for construction of covered drain @ Rs 1659.17/Rm (As per Annexure-I) Total length = 81.00 M Clear Width = 0.70 M | 81 | sqm | 15,463.85 ₹12.5 L | 16,500 ₹13.4 L | 15,463.85 ₹12.5 L | 15,463.85 ₹12.5 L |
| 10.00 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade | 24.3 | cum | 183.17 ₹4,451.03 | 180 ₹4,374 | 183.17 ₹4,451.03 | 183.17 ₹4,451.03 |
Tender Value
₹29.9 L
EMD Value
₹59,840
Closing Date
2 Mar 2026, 2:00 pmClosed
Executive Officer, Sibsagar Municipal Board
OFFICE OF THE SIBSAGAR MUNICIPAL BOARD
Construction of covered drain at Na Ali from chainage 275.00 M from the junction of K.P. Changkakoty Road up to 356.00 M and renovation of drain from 356.00 M up to B.G. Road at Ward No- 11 of Sivasagar Municipal Board under 15th FC
2026_UDD_50994_1
S.M.B/690/9213-18 Dated 09/02/2026
Open Tender
Civil Works
SIVASAGAR
AS OER DNIT AND SBD
3 documents required · 3 mandatory
₹500
₹59,840
Yes
OFFICE CHAMBER OF THE EXECUTIVE OFFICER SIBSAGAR M
6 May 2026
10 Feb 2026
2 Mar 2026
10 Feb 2026
2 Mar 2026
17 Feb 2026
10 Feb 2026 - 16 Feb 2026
16 Feb 2026
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid