| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.5 CrAccepted-AOC NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | ₹7.5 Cr Quoted ₹6.4 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹7.0 Cr+₹58.5 L (9.18%)Rejected-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹7.0 Cr+₹58.5 L (9.18%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹7.2 Cr+₹82.7 L (13.0%)Rejected-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹7.2 Cr+₹82.7 L (13.0%) | L-3 | Rejected-Finance L-3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical not coconfirming to clause 19(x) |
| Sl No | Description | Qty | Unit | Durga Engineers and Earth Movers L2 | GSB DEVELOPERS PRIVATE LIMITED L1 | M/S UNITE ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Surface dewatering of foundation including all arrangement in kwh by diesel pump set. | 908 | Hour | 70 ₹63,560 Lowest | 120 ₹1,08,960 | 72 ₹65,376 |
| 2.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge | 233.52 | Sqm | 350 ₹81,732 | 500 ₹1,16,760 | 345 ₹80,564.4 Lowest |
| 3.00 | Earth work in embankment by power transported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders. | 1,169.14 | Cum | 80 ₹93,531.2 Lowest | 120 ₹1,40,296.8 | 145 ₹1,69,525.3 |
| 4.00 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including all lift & lead as directed by Engineer- in-Charge. | 39,358.25 | Cum | 70 ₹27,55,077.5 | 60 ₹23,61,495 Lowest | 65 ₹25,58,286.25 |
| 5.00 | Earthwork in foundation in dry ordinary soilincluding lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in charge upto distance of 30m from the foundation trenches for other structure. | 17,149.84 | Cum | 70 ₹12,00,488.8 | 60 ₹10,28,990.4 Lowest | 65 ₹11,14,739.6 |
| 6.00 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as directed by Engineer- in-Charge. | 52,084.74 | Cum | 70 ₹36,45,931.8 | 40 ₹20,83,389.6 Lowest | 62 ₹32,29,253.88 |
| 7.00 | Earthwork in removing bundha diversion including disposal of removed earth as per directed by engineer in charge incluing lift of 1.5m and lead upto 30m with all cost of labour material T&P etc complete. | 3,729.71 | Cum | 50 ₹1,86,485.5 | 50 ₹1,86,485.5 | 45 ₹1,67,836.95 Lowest |
| 8.00 | Providing concrete for plain concrete M 10 grade in foundations including cost of finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20-40 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete, including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 1,451.68 | Cum | 4,000 ₹58,06,720 Lowest | 4,800 ₹69,68,064 | 4,750 ₹68,95,480 |
| 9.00 | Providing concrete for plain or Reinforced cement concrete M 15 grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 1,183.82 | Cum | 5,000 ₹59,19,100 Lowest | 5,000 ₹59,19,100 Lowest | 6,245 ₹73,92,955.9 |
| 10.00 | Providing concrete for Reinforced cement concrete M20 grade in foundations including cost of finishing etc and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 515.01 | Cum | 6,000 ₹30,90,060 Lowest | 6,800 ₹35,02,068 | 6,845 ₹35,25,243.45 |
Tender Value
₹7.6 Cr
EMD Value
₹15.2 L
Closing Date
27 Oct 2025, 3:00 pmClosed
S.E.Drainage Circle. Aligarh
office of S.E.Drainage Circle. Aligarh
Restoration work of Damaged Structure of Syphon, V.R.B, Kulaba, Pitching and Banks etc. of Dy. Nuh System
2025_UPIDC_1083025_1
19/SE/DCA/2025-26
Open Tender
Civil Works - Canal
Item Wise
365 days
FIROZABAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,516
₹15.2 L
Yes
18.10.2025
22 Nov 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
18 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tendernotice_2.pdf
PDF • 1.55 MB
BOQ_1983676.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .