Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹5,750
Closing Date
2 Jul 2026, 10:00 pmClosed
Directorate of Municipal Administration
Mrs Meheboobjan
7204404736
Rewinding of Motor Borewells in the town limit of TMC Mahalingpur from Ward no 01 to 23 for the year of 2026-27
DMA/2026-27/OW/WORK_INDENT59385
DMA/2026-27/OW/WORK_INDENT59385
Open
Other Works
Electronic Documents, First(One Cover)
DMA Town Municipal Council Mahaligpura
6 documents required · 6 mandatory
₹500
₹5,750
12 Jun 2026
12 Jun 2026
1 Jul 2026
Rewinding of Motor Borewells in the town limit of TMC Mahalingpur from Ward no 01 to 23 for the year of 2026-27
Rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and...
Rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and...
Rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and...
Rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and...
Rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x1.5...
Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x2.5...
Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x4 m...
Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x6 m...
Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x10 ...
Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog ...
Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog ...
Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog ...
Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at t...
Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/2...
Supply and delivery at site 50mm(2”) dia heavy duty unplasticized PVC Column pipes with heavy duty collars,rubber profile ring,vibration control profile ring,freezing and turbulence free leak proof ...
Supply and delivery at site 50mm(2”) dia heavy duty CI adopter set complete suitable for uPVC Column pipes for Submersible pumpsets
Supply and delivery at site Accessories for Single Phase pumpset like SS Groove Nipples,SS Studs & Nuts,Screw Clips &water proof Insulation Tape etc complete with ISI mark
Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well cap...
Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., com...
Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of sa...
Rewinding of monoblock motor with copper insulaton wire suitable gauge as per ISI specification with all necessary materials and labour,tools and equipments with guarantee period of not less than 12 m...
Rewinding of monoblock motor with copper insulaton wire suitable gauge as per ISI specification with all necessary materials and labour,tools and equipments with guarantee period of not less than 12 m...
Rewinding of monoblock motor with copper insulaton wire suitable gauge as per ISI specification with all necessary materials and labour,tools and equipments with guarantee period of not less than 12 m...
Rewinding of monoblock motor with copper insulaton wire suitable gauge as per ISI specification with all necessary materials and labour,tools and equipments with guarantee period of not less than 12 m...
Rewinding of monoblock motor with copper insulaton wire suitable gauge as per ISI specification with all necessary materials and labour,tools and equipments with guarantee period of not less than 12 m...
Rewinding of monoblock motor with copper insulaton wire suitable gauge as per ISI specification with all necessary materials and labour,tools and equipments with guarantee period of not less than 12 m...
PVC insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments 3.5 x 6 sqmm
PVC insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments 3.5 x 10 sqmm
PVC insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments 3.5 x 16 sqmm
Supply and Installation of HDPE pipe grade PE80-PN 10, 32mm dia
Supply and Installation HDPE pipe grade PE80-PN 10, 40mm dia
90Sqmm Aluminium Lugs
120Sqmm Aluminium Lugs
150Sqmm Aluminium Lugs
Copper Wire 7/18 SWG
Copper Wire 7/20 SWG
32Amps Fues Cutouts
63Amps Fues Cutouts
Starter Kit set
PVC insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments 3.5 x 6 sqmm
PVC insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments 3.5 x 10 sqmm
PVC insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments 3.5 x 16 sqmm
Supply and Installation of HDPE pipe grade PE80-PN 10, 32mm dia
Supply and Installation HDPE pipe grade PE80-PN 10, 40mm dia
Starter Volt Coil
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
59385.doc
Tender Document • 0.75 MB
2026-27 Motor Rewinding.pdf
Technical Information / Worksheet • 8.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].