Loading…
Loading…
Tender Value
₹17.1 L
EMD Value
₹34,101
Closing Date
9 Jul 2026, 2:00 pm
Office of the Director, PNHZ Park, Darjeeling
Residence of the Director, PNHZ Park, Darjeeling
Renovation of Red Panda Night Shelter Enclosure-2 and 3 at PNHZ Park, Darjeeling
2026_WBZA_1029593_1
NIeT-11/PNHZP/2026-27
Open Tender
CIVIL WORKS
180 days
Darjeeling
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹34,101
25 Jun 2026
25 Jun 2026
13 Jul 2026
25 Jun 2026
9 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling all type of masonry excepting cement concrete plain of reinforced stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.. | |||||
| 1.01 | (a) In ground floor including roof. | 1 | Cu.M | 0.44 | ₹0.44 |
| 2Dismantling R.C.floor, roof,beams etc. including cutting rods and removing rubbish as directed with in a lead of 75 m. including stacking of steel bars. | |||||
| 2.01 | (a) In ground floor including roof. | - | Cu.M | 0.12 | - |
| 3Dismantling all type of plain cement concrete works, stacking serviceable materrials at site and removing rubbish as directed with in a lead of 75 m In ground floor including roof. | |||||
| 3.01 | (b) above 150 mm. thick. | - | Cu.M | 0.84 | - |
| 4Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . | |||||
| 4.01 | (a) Depth of excavation not exceeding 1.500 mm. | - | Cu.M | 0.19 | - |
| 5Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work). | |||||
| 5.01 | (a) With earth obtained from excavation of foundation. | - | Cu.M | 0.66 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2528580.xls
BOQ • 0.30 MB
2911.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid