Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹83.2 L+₹3.4 L (4.28%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹80.7 L
EMD Value
₹50,500
Closing Date
20 Dec 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Arulmigu Varadharajaperumal Temple, Panruti Town and Taluk, Cuddalore District - 607106.
Arulmigu Sokkanathaawamy Temple, Manamthavizhnthaputhur, Panruti Taluk, Cuddalore District.
2024_HRCE_504323_1
726636/2024/Q4
Open Tender
Civil Works
Item Rate
450 days
Manamthavizhnthaputhur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹50,500
8 Apr 2025
2 Dec 2024
20 Dec 2024
2 Dec 2024
20 Dec 2024
2 Dec 2024
Amount
Providing scaffolding charges for Vimanam/Gopuram with casurina posts coconut or palm trees wherever necessary for main formwork and providing with net lawn/pvc mesh coveribg, providing ladder arrangements, country wood plank for working inspection etc., complete Hire charges only for errection and maintenance and removing the same on completion of work. as per standard specification 15' feet h
Swamy & Amman Sannathy
Vinayagar & Murugan Sanahty
Clean removal of damaged vargapoochu from the surface of walls raking out the joints 20mm deep and from open terrace raking out the joints 12mm deep etc., complete as per standard specifications.
Swamy & Amman Sannathy height 15'
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime mortar 1:1.5 (Heritage works) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime mortar 1:1.5 (Heritage works) and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc., complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area
Swamy & Amman Sannathy
Vinayagar & Murugan Sanahty
Painting with multicolour (panchavarnam) good emulsion paints complete for the vimanams/gopurams, including cost and conveyance of all materials , labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc, complete which including all extra for foldings 100 sft
Swamy & Amman Sannathy
Vinayagar & Murugan Sanahty
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Swamy & Amman Sannathy
Vinayagar & Murugan Sanahty
Front Mandabam
Navagraham
Outer Madhil Suvar
Providing herbal water washing to existing cutstone masonry work for the removal of lime wash on stone and other deposits like soot and enamel paints.
Swamy & Amman Sannathy
Pointing the cut stone joints with Lm 1:1.50,12mm deep including cost of special tiles such brush and watering, curing etc., complete as per standard specifications.
Swamy & Amman Sannathy
Supplying and fixing teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specification.
Swamy & Amman Sannathy (3'0"x5'6")
Vinayagar & Murugan Sanahty (3'0"x5'6")
Front Mandabam (6'0"x10'0")
Removal of Cement Concrete Floor Including all labour charges and clearing away the debris from the site. etc, complete SOR SINo: 22 Page no :22
Swamy & Amman Sannathy
Vinayagar & Murugan Sanahty
Supplying and filling sand in layers of not more than 100mm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Swamy & Amman Sannathy
Vinayagar & Murugan Sanahty
Front Mandabam
Outer Praharam
Outer Madhil Suvar
Paving with cut stone flooring using cut stone of size600x600mm and 100mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges.
Swamy & Amman Sannathy ( 3 line dressing)
Vinayagar & Murugan Sanahty ( 3 line dressing)
Front Mandabam ( 3 line dressing)
Outer Praharam ( One line dressing)
Ornamental Brick work in LM 1:2 mix using II Class ground Moulded Chamber Burnt Bricks of size 9" x 43/8" x 23/4"all vari vargams, moulds, sthambas,mukapatram,koodu,nasi,and all ornamental brick workcomplete panchavarnam agaraies, karnakoodus etc forming core walls rajagopuram/vimanams complete in cluding cement al labour chagers
Vinayagar & Murugan Sanahty
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of R.C.C. work etc., complete as per standard specification.
Front Mandabam
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of walls brick or stone in clay wall under 3 M height etc.,complete as per standard specification.
Front Mandabam
Inner Madhil Suvar
Earthwork excavation for foundation in all soils except hard rock requiring blasting to a full depth with initial lead of 10 m and lift of 2m etc., complete
Front Mandabam
Outer Madhil Suvar
Cement concrete 1:5:10 (One of cement five of sand and ten of HBG jelly) for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in respects complying with relevant Std, Specification and as directed by the Department Officers.
Front Mandabam
Outer Madhil Suvar
Centering for soffits of Rcc slabs of plain surface like lintels, beams, etc., including strutting 3M high using MS sheets of size 90cmx60cm and BG 10 stiffened with MS angles of size 25x25x3mm laid over silver oak (C.W) joists of size 10x6.5cm (spaced at about 90cm c/c) and supports 75cm c/c complying with standard specification and directed 10sqm..
Column
Column, Beam, Roof Slab
Providing and laying in position, Standardised concrete mix M-20 grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/super plasticier) in recommended proportions as per IS:9103 to accelerate, rated setting of concrete improve workability without imparing strength and durability without (5 cum) 7730kg, of 20mm machine crushed stone jelly and with about (3.30 cum) 5156kg, of 10 - 12 mm machine pressed stone jelly and with about (4.79 cum) 7670kg of sand, but excluding cost of reinforcement grill an fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibraters, finishing, curing etc., and providing fixtures like fan clams in the RCC floor/ roof slabs where ever necessary without clamping etc., complete as per the standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
Upto Basement
GF Superstructure
Supplying and fabricating and placing in position MS grills for reinforcement including cost of steel for all works. The rate including cost of binding wire also.
Front Mandabam
Outer Madhil Suvar
Brick work in cm 1:5 using Third class Country bricks of size 83/4" x 41/4" x 21/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc., complete complying with standard specification.
GF Superstructure
GF Superstructure
GF Superstructure
Plastering with Cement mortar1:5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc., complete complying with standard specifications.
Front Mandabam
Inner Madhil Suvar
Outer Madhil Suvar
Painting new wood work with two coats of synthetic enamel paint of approved quality and color over one coat of white primer in all floors the rate is to include cost of all materials, brushes scaffolding charges etc, complete complying with standard specifications.
Front Mandabam
Sub total
S.SENTHAMARAIKANNAN (BID ID -1213815)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_600003.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .