Loading…
Loading…
Tender Value
₹11.3 L
EMD Value
₹22,680
Closing Date
13 Jul 2026, 6:00 pm3d left
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISION SMC REGAL LANE LAL CHOWK
Development of surface drain by way of iron trash near graveyard at Rather Mohalla Nowshera
2026_HAUDD_314116_3
SHORTTerm NOTICE INVITING ETENDER No. 04 of 2026-2027 Dated 01.07.2026 RRWD SMC
Open Tender
Civil Works
42 days
Rather Mohalla Nowshera
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹602
FA/CAO AC NO 0216010200000007
₹22,680
1 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labourers for site clearance | 10 | No. | 553 | ₹5,530 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 12.91 | Cum | 1,725.2 | ₹22,272.33 |
| 3 | Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively)Wet | 15.56 | Cum | 184.95 | ₹2,877.82 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 34.66 | Cum | 5,733.6 | ₹1,98,726.58 |
| 5 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 5,626.82 | Kgs | 138.2 | ₹7,77,626.52 |
| 6 | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) | 225.37 | Sqm | 283.8 | ₹63,960.01 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 123.14 | Sqm | 286.35 | ₹35,261.14 |
| 8 | Removal of Mulba/Unhygienic Material/Mud from the site including its disposal beyond Municipal Limits by Mechanical Transport including all carriages, leads and Lifts complete job as directed at site. | 24.11 | Cum | 350 | ₹8,438.5 |
| 9 | Carriage of material by mechanical means.
A. Stone Aggregate | 31.19 | Cum | 409.94 | ₹12,786.03 |
| 10 | Carriage of material by mechanical means.
B. Sand | 15.59 | Cum | 409.94 | ₹6,390.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1017128.xls
BOQ • 0.34 MB
Andum45-pages.pdf
PDF • 0.91 MB
Download all tender documents and submit your bid