| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.9 L+₹80,620 (9.97%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical pqc not qualified |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
5 Jul 2021, 1:00 pmClosed
SE OMC V CTPS PARICHHA JHANSI
OFFICE OF SE OMC V CTPS PARICHHA JHANSI
Maintenance, Overhauling and replacement work in FO pump house of 2x210 MW, 2x250 MW and common area of PTPP, Parichha.
2021_RVUNL_593160_1
T-04/CHD-II/OMC-V/PTPP/2021-22
Open Tender
Miscellaneous Works
Fixed-rate
365 days
PTPP PARICHHA JHANSI
As per tender document
2 documents required · 2 mandatory
₹590
DY CAO CFA AND BO PTPP PARICHHA
₹15,000
13 Sept 2021
7 Jun 2021
7 Jul 2021
7 Jun 2021
5 Jul 2021
7 Jun 2021
7 Jun 2021 - 5 Jul 2021
Amount
FO PUMP HOUSE, 2X110 MW Units
O/H of LDO unloading pump
O/H of steam jacketed FO unloading pump type R-1000 E-G
O/H of LDO pressurising pump
O/H of dewatering pump type LBD 80/40
O/H of dewatering pump type TE-3
Revisioning of valves & traps of varying sizes from 15mm to 200mm
A. Jointing in 25mm to 100mm steam/oil /condensate lines.
B. Jointing in 100mm to 200mm steam/oil /condensate lines.
Overhauling of relief valves
A. LDO pressurising pump
B. FO unloading pump
Replacement of gaskets
Cleaning of filters.
A. Suction filter of FO/LDOpressurising pump
C. Suction filter of F O/LDO unloading pumps.
Cleaning of air vents of FO/LDO storage tanks.
Repairing of Steam/oil valves of size
Replacement of steam/oil valves, NRV and steam traps of size
A. 15 mm to 40 mm
B. 50 mm to 100 mm
FO PUMP HOUSE, 2X210 MW Units
Overhauling of LDO pressurising Pump
Overhauling of FO transfer Pump
Overhauling of LDO transfer Pump
Overhauling of sump Pump
Revisioning of valves and traps of various size from 15mm to 300mm
Jointing in 25mm to 100mm to steam/ oil/condensate and air line
Jointing in above 100mm to 200mm to steam/ oil/condensate line
Jointing in above 200mm to 300mm to steam/ oil/condensate line
Joint of steam tracing and air line of size 15mm
Overhauling of relief valves
LDO pressurising pump
F O transfer pump
LDO transfer pump
Replacement of old cartridges with new /repaired cartridges supplied by department free of cost
A. LDO pressuring pump
Replacement of gaskets
Cleaning of filters
Suction filter of L DO pressurising pump
Suction filter of F O transfer pump
Suction filter of L D O transfer pump
Cleaning of air vents of FO/LDO day oil tanks
Repairing of Steam/oil valves of size 15 mm
Replacement of steam/oil valves, NRV and steam traps of size
A. 15 mm to 40 mm
B. 50 mm to 100 mm
FO PUMP HOUSE, 2X250 MW Units
Overhauling of FO Pressuring Pump
Overhauling of LDO pressurising Pump
Overhauling of FO transfer Pump
Overhauling of LDO transfer Pump
Overhauling of sump Pump
Overhauling of steam heaters of FO heating units
Revisioning of valves and traps of various size from 15mm to 300mm
Jointing in 25mm to 100mm to steam/ oil/condensate and air line
Jointing in above 100mm to 200mm to steam/ oil/condensate line
Jointing in above 200mm to 300mm tosteam/ oil/condensate line
Joint of steam tracing and air line of size 15mm
Overhauling of relief valves
F O Pressuring pump
LDO Pressuring pump
FO transfer pump
LDO transfer pump
Replacement of old cartridges with new /repaired cartridges supplied by department free of Cost
A. LDO pressuring pump
B. FO pressuring pump
Replacement of gaskets
O/H of safety valves of steam heater of FO heating
Cleaning of filters
Suction filter of LDO pressurising pump
Suction filter of F O Pressuring pump
Suction filter of FO transfer pump
Suction filter of L D O transfer pump
Cleaning of air vents of FO/LDO day oil Tanks
Repairing of Steam/oil valves of size 15mm
Replacement of steam/oil valves, NRV and steam traps of size
A. 15 mm to 40 mm
B. 50 mm to 100 mm
Replacement / Servicing of valves
Replacement of valves(size 10mm to 25mm)
Replacement of valves(size 40mm to 65mm)
Replacement of valves(size 80mm to 200mm)
Servicing of Air line valves, oil line valves, steam line valves
PEETAMBRA ENGINEERS AND CONTRACTORS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .