Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42,019Accepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹47,766+₹5,747.50 (13.7%)Rejected-AOC COLLINPUR SOUTH ANDAMAN | L2 | Rejected-AOC L2 | |
| 3 | L3₹48,232+₹6,213.50 (14.8%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹66,785+₹24,766.50 (58.9%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹60,367
EMD Value
₹1,207
Closing Date
6 Oct 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, RCD,APWD, Wimberly Gunj
Executive Engineer, RCD,APWD, Wimberly Gunj
Levelling of Play Field behind Panchayat Office at Templemyo
2020_APWD_1106_1
NIT No. 25/EE/RCD/APWD/WG/2020-21
Open Tender
Civil Works - Others
Item Rate
30 days
Wimberly Gunj
Please refer Tender documents.
6 documents required · 6 mandatory
₹150
EE, RCD APWD Wimberly Gunj
₹1,207
4 Nov 2020
22 Sept 2020
8 Oct 2020
22 Sept 2020
6 Oct 2020
26 Sept 2020
60 days
Amount
EARTH WORK
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
CONCRETE WORK
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
STEEL WORK
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Non-Schedule Item
Rolling with power of minimum 8 tonees for banking excavated earth in layers not exceeding 20 cm in depth.
RAKESH SAHA
T ABDUL BASHEER
NASIR HUSSAIN
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .