Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.7 L+₹3,912.42 (2.33%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.9 L+₹23,218.42 (13.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹5,910
Closing Date
11 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O LANE AND DRAIN FROM THE HOUSE OF MOHD. YOUSUF MIR TO ABDUL REHAMAN BHAT AT LADDI, DULPATI
2026_RDPR_314757_9
E-NIT 52 of 2026-2027
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹5,910
15 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
11 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearence by way of engaging labours removal of debris and bushes, and disposal etc. | - | No | - | - |
| 0.0 | Earth work in Surface excavation exceeding 1.5 m in width as well as 10 Sqm. in plan) including disposal. All kinds of Soil. | - | sqm | - | - |
| 0.0 | Earth work in excavation in foundation trenches (not exceeding 1.5 m in width as well as 10 Sqm. in plan) including dressing of slides and ramming of bottoms, lift up to 1.50 m and disposal lead upto 1.5m. All kinds of Soil. | - | Cum | - | - |
| 0.0 | P/L of dry stone soling hand packed including all carriages | - | Cum | 1 | - |
| 0.0 | P/L in position C.C of specified grade excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | - | Cum | - | - |
| 0.0 | P/L OF PLUMS | - | Cum | 1 | - |
| 0.0 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kgs | 1 | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job | - | Sqm | - | - |
| 0.0 | Carriage of Sand/Agg. by MT of 30 KM (Paid as per Actual) | - | Cum | - | - |
| 0.0 | Carriage of cement, steel etc by MT | - | Trip | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1019490.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .