Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC CONTR VILLAGE BIHALI PO LARJI TEHSIL SAINJ DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172002 | ₹7.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.2 LRejected-Finance V P O GANVI TEH RAMPUR DISTT SHIMLA | GANVI | SHIMLA | HIMACHAL PRADESH | ₹8.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹8.2 LRejected-Finance | ₹8.2 L | L3 | Rejected-Finance L3 |
| 4 | L4₹8.5 LRejected-Finance HIMACHAL PRADESH HP | SHIMLA | HIMACHAL PRADESH | 171001 | ₹8.5 L | L4 | Rejected-Finance L4 |
| 5 | L5₹8.7 LRejected-Finance | ₹8.7 L | L5 | Rejected-Finance L5 |
Tender Value
₹10.4 L
EMD Value
₹10,387
Closing Date
12 Feb 2026, 12:00 pmClosed
Resident Engineer
Resident Engineer, GPHD, Jeori
Repair/ Restoration of trash rack and trench Weir U/S and D/S of trash rack and Back portion of guide wall left bank of ganvi khad and covering of gate structure portion by MS sheet at Ganvi Intake stage-I (2X11.25MW) which was damaged due to heavy
2026_HPSEB_127692_1
HPSEBL/GPHD/DB-9/2025-26-153
Open Tender
Civil Works
30 days
Ganvi
Please refer Tender documents.
6 documents required · 6 mandatory
₹590
₹10,387
30 May 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
12 Feb 2026
6 Feb 2026
Temporary diverison of water inflow of Ganvi khad at upstrem of trench weir by providing properly hand packed earth,sand and gravel filled bags in order to smooth working and to avoid any kind of damages to freshly poured concrete complete in all respects as per the direction of EIC.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Chiselling of erroded surface of concrete block for making keys and rough surface as per the direction of Engineer-in charge
Applying cement slurry on R.C.C slab or cement concrete work on the rough/chieslling surface of concrete blocks using 2.75 kg of cement per sq.mtrs.of floor area before laying cement concrete including cleaning the surface complete in all respect as per the the direction of Engineer-in-charge
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size)
Supply fabrication, painting, transportation to project site, errection commissioning of trash rack complete in all respects with all accessories as per direction of EIC.
Steel workwelded in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position , including welding and bolted with special shaped washers etc. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_188598.xls
BOQ • 0.29 MB
trench.pdf
Tender Documents • 0.81 MB
Download all tender documents and submit your bid