Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.8 LAccepted-AOC | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 Contractor, Bridge and Roads, Chennai at their revised quoted total amount of Rs. 46,80,300 /- for the work. | |
| 2 | L2₹49.8 L+₹2.3 L (4.95%)Rejected-Finance | L2 | Rejected-Finance L2 Contractor, not accepted by CWC | |
| 3 | L3₹50.0 L+₹2.5 L (5.29%)Rejected-Finance | L3 | Rejected-Finance L3 Contractor, not accepted by CWC | |
| 4 | L4₹50.2 L+₹2.7 L (5.77%)Rejected-Finance | L4 | Rejected-Finance L4 Contractor, not accepted by CWC |
| Sl No | Description | Qty | Unit | BRIDGE AND ROADS L1 | Siva Enterprises L3 | S VINAYAGAMURTHY L4 | B.V.Enterprises L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in hard/ dense soil in trenches width and depth not exceeding 1.50m and getting out. | 325 | CUM | 550 ₹1,78,750 | 855 ₹2,77,875 | 540 ₹1,75,500 Lowest | 708 ₹2,30,100 |
| 2.00 | Material and labour for sand filling under foundation including watering and consolidation. | 32 | CUM | 2,100 ₹67,200 | 2,455 ₹78,560 | 2,300 ₹73,600 | 2,075 ₹66,400 Lowest |
| 3.00 | M & L for PCC 1:3:6, C2 Type using 40mm graded aggregated in flooring. | 40 | CUM | 6,100 ₹2,44,000 | 5,755 ₹2,30,200 Lowest | 6,450 ₹2,58,000 | 6,155 ₹2,46,200 |
| 4.00 | M & L for providing reinforcement cement concrete in Footings, piles, Plinth beam with cement concrete A1 Type, 1:1.5:3 mix using 20mm graded aggregated. | 105 | CUM | 8,000 ₹8,40,000 | 7,755 ₹8,14,275 Lowest | 7,900 ₹8,29,500 | 7,760 ₹8,14,800 |
| 5.00 | M & L for providing reinforcement cement concrete in column, pillars and struts with cement concrete A1 Type, 1:1.5:3 mix using 20mm graded aggregated. | 12 | CUM | 8,500 ₹1,02,000 | 8,155 ₹97,860 Lowest | 8,200 ₹98,400 | 8,720 ₹1,04,640 |
| 6.00 | M & L for form work to sides of concrete foundation, bases of column, beam sides and soffits of foundation and plinth beams. (Flat) | 425 | SQM | 600 ₹2,55,000 | 755 ₹3,20,875 | 445 ₹1,89,125 | 420 ₹1,78,500 Lowest |
| 7.00 | M & L for form work to RCC members such as columns, pillers etc., | 185 | SQM | 600 ₹1,11,000 | 755 ₹1,39,675 | 530 ₹98,050 Lowest | 715 ₹1,32,275 |
| 8.00 | Supply and fixing of twisted MS Bars 10mm dia and over, cut to length bent to shape required including cranking, bending, spiraling for hoping for columns, hooking ends and binding with MS Wire not less than 0.9mm dia or securing with clips. | 5,100 | KG | 90 ₹4,59,000 Lowest | 105 ₹5,35,500 | 101 ₹5,15,100 | 90 ₹4,59,000 Lowest |
| 9.00 | Supply and fixing of twisted MS Bars 6mm dia up to 8mm dia cut to length bent to shape required including cranking, bending, spiraling for hoping for columns, hooking ends and binding with MS Wire not less than 0.9mm dia or securing with clips. | 2,000 | KG | 90 ₹1,80,000 Lowest | 105 ₹2,10,000 | 102 ₹2,04,000 | 90 ₹1,80,000 Lowest |
| 10.00 | M & L for Brick work built in CM.1:6 using Sub-Class “B” Bricks,straight or curved on plan exc 6m mean radius. | 63 | CUM | 6,500 ₹4,09,500 Lowest | 7,955 ₹5,01,165 | 7,202 ₹4,53,726 | 6,800 ₹4,28,400 |
Tender Value
₹49.3 L
EMD Value
₹1 L
Closing Date
21 Aug 2025, 2:00 pmClosed
THE CHIEF GENERAL MANAGER
THE CGM HVF, AVADI, CHENNAI
REPAIRS TO COMPOUND WALL AROUND SOQ AT HVF ESTATE
2025_AVNL_243726_1
HVF/TE/13025/CEO/2025-26/32
Open Tender
Civil Works
Works
120 days
HVF ESTATE, AVADI
DETAILS ENCLOSED
8 documents required · 8 mandatory
₹0
₹1 L
28 Oct 2025
5 Aug 2025
23 Aug 2025
5 Aug 2025
21 Aug 2025
5 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .