Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 CrAccepted-AOC 196 SECTOR 16 CHANDIGARH | CHANDIGARH | ₹17.7 Cr Quoted ₹16.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹17.7 Cr+₹86.4 L (5.13%)Rejected-Finance | ₹17.7 Cr+₹86.4 L (5.13%) | L2 | Rejected-Finance Due to L2 |
| 3 | Rejected-Technical R O BLOCK NO 2 FLAT NO B 1 STRAWBARY HILL CHOTTA SHIMLA 2 HP | CHAMBA | HIMACHAL PRADESH | 176207 | - | - | Rejected-Technical Detail of machinery and technical personnel is not in order |
| 4 | Rejected-Technical | - | - | Rejected-Technical Certificate of liquid assets/ credit facilities has not attached |
| 5 | Rejected-Technical | - | - | Rejected-Technical Detail of machinery is not is order |
Tender Value
Refer Docs
EMD Value
₹38.2 L
Closing Date
25 Jun 2026, 5:00 pmClosed
Superintending Engineer
11th Circle HPPWD Rampur Bsr
Construction of Dai Barkeli road Km 0.000 to 5.500 Construction of Chari to Dharan road Km 0.000 to 3.800 and Construction of Chakti to Thaili road Km 0.000 to 3.500 HP09831 HP09832 and HP09836
2026_CEHP_148216_8
2416-35 dated 04.06.2026
National Competitive Bid
Civil Works - Roads
Percentage
540 days
Rampur Bsr
Please refer Tender documents.
27 documents required · 27 mandatory
₹20,000
₹38.2 L
5 Sept 2026
10 Jun 2026
27 Jun 2026
10 Jun 2026
25 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Dai Barkeli Road KM.0.000 to 5.500 (Package No-09-831) | |||||
| 1.01 | Excavation in soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock All work of rock cutting by blastingshall be carried out by taking all necesary precautions against soil erosion,damages to hill side, water pollution etc. and to protect stability of hill side Rock shall be excavated with chiseling and wedging out of rock (where blasting is prohibited) All earth work in cutting /excavation including rock excavation shall be carried out true to lines,grades,sides slopes, width, camber, super-elevation and level as shown on the drawing and as directed by the Engineer-in-Charge in conformity with the requirement of MoRD technical specification for Rural Road, Section. 300 & 1600 to achive designed formation width including hauling and stacking of materials useful for constrcution at suitable sites safe manner and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load and animal transport and mechanical means along with its levelling, fine dressing and carriage of machineries, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. The land for dumping sites shall be arranged by the contractors himself and nothing extra shall be paid on this account, filling of unevenness blind age and finishing of the road to specified dimensions or as directed by the Engineer-in-charge for smooth riding.The recovery for stones, whether usefule or not for 3211.10 cum. (Thrre Thousand Two Hundred eleven point one Zero Cubic Metre) in all cases, @ Rupees 300/= only (Rupees three Hundred) per cubic metre shall be effected on prorata basis in all circumstances. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases. | 22,309.28 | Per cubic metre | - | - |
| 1.02 | Earth work in excavation for structures in all depths as per drawing and technical specification for rural roads August 2004 clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock(where blasting is prohibited).all earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner treaming filling of unevenness blind age and finishing of the road to specified dimension or as directed by the Enginer-in-Charge The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 1,593.46 | Per cubic metre | - | - |
| 1.03 | Providing and laying concrete mechanically mixed and vibrated PCC M-10 design miox with minimum cement contents not less than 250 kg (two hundred fifty kilogram) per cubic metre (1:3:6 Nominal mix)with 20mm(twenty millimeter) nominal size for plain/reinforced concrete in open foundation and plinths or similar works complete as per drawings and MoRD technical specification section 800, 900, 1200 and 1600 and curing complete including the cost ofform work and hauling of materail in all leads and lifts as per the entire satisfication and direction of Engineer in charge.The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 109.46 | Per cubic metre | 7,337.5 | ₹8,03,162.75 |
| 1.04 | Providing and laying concrete mechanically mixed and vibrated PCC M-10 (1:3:6 Nominal mix)with 20mm(twenty millimeter) nominal size for plain/reinforced concrete in open foundation and plinths or similar works complete as per drawings and MoRD technical specification section 800, 900, 1200 and 1600 and curing complete including the cost ofform work and hauling of materail in all leads and lifts as per the entire satisfication and direction of Engineer in charge.The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 576.35 | Per cubic metre | 6,926.12 | ₹39,91,869.26 |
| 1.05 | Providing and laying concrete mechanically mixed and vibrated PCC M-15 (1:2.5:5 Nominal mix)with 20mm(twenty millimeter) nominal size for plain/reinforced concrete in open foundation and plinths or similar works complete as per drawings and MoRD technical specification section 800, 900, 1200 and 1600 and curing complete including the cost ofform work and hauling of materail in all leads and lifts as per the entire satisfication and direction of Engineer in charge.The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 0.24 | Per cubic metre | 6,329.7 | ₹1,518.5 |
| 1.06 | Providing and laying concrete mechanicallymixed and vibrated PCC grade M-15 (M-fifteen) design mix with cement contents not less than 275kg (two hundred seventy five kilogram per cubic metre) with aggregate 40mm (forty millimeter) nominaal size for plain/reinforced concrete in open foundation and plinths or similar works (In Flooring) complete as per drawings and MoRD technical specification section 800, 900, 1200 & 1600 and curing complete including the cost of form work and hauling of materail in all leads and lifts as per the entiresatisficationanddirectionof Engineer incharge.Therateisincludingoctroi,royality, Malkana, toll tax or anyother taxes imposed bythe Government but excluding GST. | 407.61 | Per cubic metre | 7,168.85 | ₹29,22,094.95 |
| 1.07 | Providing and laying of boulder apron laid in wire crates with 4 mm (four millimetre) dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm (one hundred millimetre into one hundred millimetre) mesh (woven diagonally) including 10 % (ten percent) extra for laps and joints laid with stone boulders weighing not less than 40 kg (forty kilogram) each as per drawing and MORD technical specifications section 1300 including carriage of materials with in all leads, lifts and other incidental. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 265.63 | Per cubic metre | 3,032.41 | ₹8,05,499.07 |
| 1.08 | Stone masonry in cement mortar for sub structure complete as per drawing and technical specification clause 702,704,1202 and 1204 in Cement mortar 1:6 (1 Cement : 6 sand) Random Rubble masonry. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 494.46 | Per cubic metre | 5,505.54 | ₹27,22,269.31 |
| 1.09 | Construction of dry stone masonry for retaining wall breast wall revetment wall and parapets for sub structure and super structure complete as per drawing and technical specification The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 109.08 | Per cubic metre | 3,763.7 | ₹4,10,544.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_231994.xls
BOQ • 0.51 MB
SBDDaiBarkeliChariChakti831832836.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .