| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.3 LAccepted-AOC AT NAKULABASAPUR PO HENSAMULA TALCHER DIST ANGUL ODISHA PIN 759103 | TALCHER | ANGUL | ODISHA | 759103 | L1 | Accepted-AOC ACCEPTED AND AWARDED SINCE THE BIDDER IS L1 | |
| 2 | L2₹69.1 L+₹9.5 L (16.0%)Rejected-Finance AT DERA COLLIERY TALCHER ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | L2 | Rejected-Finance SINCE THE BIDDER IS NOT L1 | |
| 3 | L3₹70.8 L+₹11.2 L (18.8%)Rejected-Finance AT PO KARIGARAPADA TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | L3 | Rejected-Finance SINCE THE BIDDER IS NOT L1 | |
| 4 | L4₹77.3 L+₹17.7 L (29.7%)Rejected-Finance AT PO GURUJANG TALCHER DIST ANGUL ODISHA PIN 759100 | TALCHER | ANGUL | ODISHA | 759100 | L4 | Rejected-Finance SINCE THE BIDDER IS NOT L1 | |
| 5 | Rejected-Technical AT PO VIDYUT COLONY FCI VIKRAMPUR TALCHER DIST ANGUL ODISHA PIN 759106 | TALCHER | ANGUL | ODISHA | 759106 | - | Rejected-Technical DOCUMENTS NOT COMPLIED AS PER NIT |
Tender Value
₹1.0 Cr
EMD Value
₹1.3 L
Closing Date
1 Nov 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO EnM LINGARAJ AREA
OFFICE OF THE GENERAL MANAGER LINGARAJ AREA, AT/PO- DEULBERA COLLIERY, DIST- ANGUL, ODISHA, 759102
Day-to-day repair, maintenance, installation, dismantling, fabrication, erection etc. in the circuit no. 3,4,5,6 and 7 of CHP Plant, Lingaraj OCP for a period of two years as and when required basis as per the direction of Engineer in-charge
2024_MCL_319267_1
GM/LA/SO/EnM/e-Ten/24-25/33 dt-16.10.24
Open Tender
Miscellaneous Works
Item Rate
730 days
LINGARAJ OCP
AS PER NIT
5 documents required · 5 mandatory
₹1.3 L
14 Jan 2025
16 Oct 2024
4 Nov 2024
17 Oct 2024
1 Nov 2024
17 Oct 2024
17 Oct 2024 - 25 Oct 2024
Amount
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. (The works includes dismantling of rollers, chain drive, tail end shaft assembly, chain with flight bar assembly, Hopper side wall facing, damage hopper wall, pressure pan, deck plate, Gantry, walkway, belt drive head structure, loop trolley drum structure, stringers counter weight supporting structure, pan, hollow shaft, Gear Box and Other relevant structures at CHP/Feeder Breaker Plant, Lingaraj OCP as per direction of EIC with required tools, tackles, cutting/welding sets, consumables, electrodes, DA/Oxygen, welding machines and other requires accessories).
Structural steel work, which includes both fabrication & erection, riveted, bolted or welded in built up sections, trusses and framed work, including cuttinB, hoisting, fixing in position etc. as required as per the direction of EIC. (The Work includes Fabrication and erection of hopper side wall, fencing damaged hopper wall, pressure pan, deck plate, gantry walk way, belt drive head structure, loop trolley drum structures, stringer, counter weight supporting structures, erection of top roller with brackets, bottom roller with hanger, chain drive shaft assembly, chain tail end assembly, chain with flight bar, pan, hollow shaft, Gear Box and other associated structures at CHP Plant, Lingaraj OCP as per direction of EIC with required tools, tackles, cutting/welding sets, consumables, electrodes, DA/Oxygen, welding machines and other requires accessories)."
Structural steel work , which includes only erection, riveted, bolted or welded in built up sections, trusses and framed work, including cuttinB, hoisting, fixing in position etc. as required as per the direction of EIC.. (The Work includes only erection of hopper side wall, fencing damaged hopper wall, pressure pan, deck plate, gantry walk way, belt drive head structure, loop trolley drum structures, stringer, counter weight supporting structures, erection of roller with brackets/hanger, chain drive shaft assembly, chain tail end assembly, chain with flight bar, pan, hollow shaft, Gear Box and other associated structures at CHP Plant, Lingaraj OCP as per direction of EIC with required tools, tackles, cutting/welding sets, consumables, electrodes, DA/Oxygen, welding machines and other requires accessories)."
Welding/cutting by gas or electric plant including transportation of plant at site etc. complete.
Total impact of GST for the purpose of CTC
OMM SHANKAR TRANSPORT (BID ID -1095644)
M/S PRAHALLAD MOHARANA. (BID ID -1097486)
M/S DIVYA SHAKTI ENTERPRISES (BID ID -1095694)
technical_330948.pdf
PDF • 0.20 MB
techsummary_330948.pdf
PDF • 0.05 MB
finance_330948.pdf
PDF • 0.20 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_330948.pdf
PDF • 0.04 MB
LOANIT33.pdf
PDF • 2.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .