| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC NO 60 CHITTOOR MAIN ROAD SENGUTTAI KATPADI TALUK VELLORE DISTRICT 632 007 | VELLORE | TAMIL NADU | 632007 | ₹2.4 Cr | L1 | Accepted-AOC Lowest Price |
| 2 | Not Admitted-Fee/PreQual/Technical 072 3 CANARA BANK UPSTAIRS PERUNDURAI ROAD KUMALANKUTTAI ERODE 638011 | ERODE | ERODE | TAMIL NADU | 638011 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | K KUTTI L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum. | 2,487.76 | m3 | 173.48 ₹4.3 L |
| 2.00 | Plain Cement Concrete M 7.5 1:4:8 (One Cement, four fine aggregates and Eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 240.59 | m3 | 5,219.98 ₹12.6 L |
| 3.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastag etc.complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 62,780.1 | Kg | 94.74 ₹59.5 L |
| 4.00Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications | ||||
| 5.00 | A. DRAIN WALL | 595.62 | m3 | 12,730.88 ₹75.8 L |
| 6.00 | B. BED SLAB | 175.38 | m3 | 9,315.37 ₹16.3 L |
| 7.00 | C. COVER SLAB | 275.33 | m3 | 12,557.49 ₹34.6 L |
| 8.00 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 1,492.66 | M3 | 103.49 ₹1.5 L |
| 9.00 | 600mm dia FRC Manhole cover to suit 600mm clear opening manhole frame and 600mm dia FRC Manhole frame to have clear opening of 600 mm dia to suit 600 mm dia FRC cover | 52 | nos | 2,568.98 ₹1.3 L |
| 10.00 | GST 18% | 1 | No | 37,07,509 ₹37.1 L |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
19 Feb 2026, 3:00 pmClosed
Commissioner
Infantry Road, Vellore Corporation, Vellore-632001
Construction of Storm Water Drain with Cover Slab at Vandranthangal Main Road (035001R005), Indra Nagar 2nd Cross Street (035001R0843), Burial Ground Road (035001R0837), PERIYAPATTARAI STREET (035005R181) - Vandranthangal Lake to Gudiyatham Rd in
2026_MAWS_652841_1
3927/2025/E2/15thCFC-25-26/P1
Open Tender
Civil Works
180 days
Vellore
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.5 L
Vellore Corporation
30 Mar 2026
7 Feb 2026
19 Feb 2026
7 Feb 2026
19 Feb 2026
7 Feb 2026
12 Feb 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum.
Plain Cement Concrete M 7.5 1:4:8 (One Cement, four fine aggregates and Eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastag etc.complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications
A. DRAIN WALL
B. BED SLAB
C. COVER SLAB
Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3
600mm dia FRC Manhole cover to suit 600mm clear opening manhole frame and 600mm dia FRC Manhole frame to have clear opening of 600 mm dia to suit 600 mm dia FRC cover
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tendernotice_2.pdf
PDF • 0.76 MB
BOQ_782808.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid