| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹9,900.05 (5.32%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.0 L+₹11,880.06 (6.38%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹3,960
Closing Date
6 Oct 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_326338_9
e-NIT No. 132 of REW Poonch 2026-27 Dated 28-09-2026
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹3,960
10 Oct 2026
28 Sept 2026
7 Oct 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 9 | cum | 479.3 | ₹4,313.7 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) with 30% stones | 26.62 | cum | 4,294.37 | ₹1,14,333.31 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 56 | sqm | 286.35 | ₹16,035.6 |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 395 | kg | 120.8 | ₹47,716 |
| 5 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with
horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum),between the two posts fitted and fixed with G.I. staples, turn buckles etc.
complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of
barbed wire used.16.22.1 With G.I. barbed wire | 370 | Rmt | 19.85 | ₹7,344.5 |
| 6 | Carriage of sand & Agg. by 10 KM by MT & HL 100 M | 26.01 | cum | 279.04 | ₹7,257.83 |
| 7 | Add the Cost of CIB | 1 | no | 1,000 | ₹1,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_1103743.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .