Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.8 L+₹8,222.50 (4.85%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.9 L+₹23,421.68 (13.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.1 L+₹35,880.01 (21.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.2 L+₹46,594.19 (27.5%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,878
Closing Date
10 Jun 2026, 4:00 pmClosed
ExEn Div Vailoo
office of the ExEn Div Vailoo
Construction of Drain FHO Bashir Ahmad Bhat upto HO Mushtaq Ahmad Bhat at Bidder ward No. 07
2026_PWDJK_311549_2
ENIT14DivisionVailoo25-26
Open Tender
Civil Works
Percentage
15 days
vailoo
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
office of the ExEn Div Vailoo
₹5,878
17 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
10 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | - | Cum | 0.6 | - |
| 2 | P/L dry stone soling (100 mm size ) duly hand packed (Quarry) and consolidated with hand rammers complete job | - | Cum | 0.2 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 0.4 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | Cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundation | 1 | Sqm | 0.8 | ₹0.8 |
| 6 | Carriage of material by mechanical transport from source of suppy upto site of work ,sand and aggregate 20 Kms | 1 | Cum | 0.8 | ₹0.8 |
| 7 | Add cost for sign board , incl installation ,painting, writing and photographs charges and other unfORESEENS. (To be paid as per actual) | - | job | 0.6 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_1008741.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .