Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹20.3 L+₹1.3 L (6.65%)Rejected-Finance | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹20.8 L+₹1.8 L (9.46%)Rejected-Finance NEAR KATI CHAURAHA HUZURPUR ROAD BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L3 | Rejected-Finance Due to L3 |
Tender Value
Refer Docs
EMD Value
₹48,000
Closing Date
23 Sept 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE SNK6 SHRAWASTI
OFFICE OF THE EE SNK6 SHRAWASTI
Constructing of Single hume pipe Syphon (1200 MM Dia) and Double flat brick lining at Km. 5.960 of Motipur Dy. in Distt.-Balrampur.
2024_UPIDC_955502_27
03/EE/SNK-6/2024-25
Open Tender
Civil Works
Item Rate
90 days
BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹48,000
20 Nov 2024
17 Sept 2024
24 Sept 2024
17 Sept 2024
23 Sept 2024
17 Sept 2024
Amount
E/W in digging foundation for Dy/Minors in all type of soil including all lead and lift, including Back filling and disposal of surplus earth for proper completion of work as per direction of Engineer-in-Charge.
Laying plain cement concrete in 1:3:6 with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work as per direction of Engineer-in-Charge.
Centering & shuttering for C.C. in 1:3:6 work including cost of all material , labour and T&P etc. required for proper completion of work as per Engineer-in-Charge.
Making sub grade on slope bed in Syphon including watering, compaction and preperation of surface as per direction of Engineer-in-Charge,
Supply & Laying RCC Hume Pipe NP 3 (1200 MM Ø) single Pipe in syphon including all material labour T&P etc. requried as per direction of Engineer-in-Charge
Brick work in 1:4 cm with 1st class brick and coarse sand of material labour, t&p etc. required for proper completion of work as per direction of Engineer-in-Charge.
Brick Pitching on edge 1:3 CM including all material, labour and T&P etc. required for compeletion of work as per direction of Engineer-in-Charge
Flush pointing 1:2 CM including all material, labour and T&P etc. required for compeletion of work as per direction of Engineer-in-Charge
Deep Struck Pointing 1:2 (CM) including all material, labour and T&P etc. required for compeletion of work as per direction of Engineer-in-Charge
Dewatering with all cost of power, P.O.L., machines ,pump,well point system and operator etc. with assembling and deassembling of machines etc.required for proper complection of work as per direction of Engineer-in-Charge. (a) Hiring charges of 5 HP deisel pum /gen. set including operator & P.O.L. for running hours.
Cost of 9.00 M Boring.
E/W making in Road Diversion including all material, labour and T&P etc. required for compeletion of work as per direction of Engineer-in-Charge
Earth work in removing road diversion including cost of all labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Earth work in making canal section above syphon including cost of all labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Two coat of Bitumen painting over sleeper at 1.70 Kg/sqm including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
P/L 50 MM thick Coarse Sand in filter below LDPE film including all labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge
Supply LDPE film, 200 Micron thick (Ist grade) including contractor's profit but excluding all taxes including all labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge
12.5 mm thick cement plaster in 1:4 cm with coarse sand over LDPE film including cost of all material labour and T&P required proper completion of work as per direction of Engineer-in-Charge
Double Flat Brick Lining in 1:3 CM with 8 MM sand withched Plaster.including cost of all material labour and T&P required proper completion of work as per direction of Engineer-in-Charge
Filling bitumen in 10 MM thick construction Joint including cost of all material labour and T&P required proper completion of work as per direction of Engineer-in-Charge
Laying porous concrete in 1:0:4 (1 cement, 0 coarse sand, 4 stone gritt) including cost of all material labour and T&P required proper completion of work as per direction of Engineer-in-Charge
M/S P.K ENTERPRISES
M/S SENGER CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .