Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
28 Aug 2026, 5:00 pm3d left
Circle Officer
Circle Office Dhenkanal
Upgradation of Health Infrastructure at Analaberini CHC of Kamakhyanagar Block Under 2nd Phase of Ama Hospital Initiatives in FY-2024-25 of Dhenkanal District.
2026_EICCL_138797_1
CCE Dkl (R and B) -08 / 2026-27
Open Tender
Civil Works - Buildings
Percentage
210 days
Dhenkanal
2 documents required · 2 mandatory
₹10,000
₹3.1 L
Yes
14 Aug 2026
14 Aug 2026
29 Aug 2026
14 Aug 2026
28 Aug 2026
14 Aug 2026
14 Aug 2026 - 20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS:-
Removing old lime or cementplaster from walls including rakingout joints 12 mm deep andremoving the debris within 50 m lead etc complete. as per direction of the Engineer-in-Charge. | 2,826.5 | sqm | 58.95 | ₹1,66,622.18 |
| 2 | Earthwork in excavation for Road work / Structure in Ordinary soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, setting out, dressing of section to correct line, level, grade and camber transporting to embankment site within all lifts and lead upto 1000mtr., utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 256.5 | cum | 74.85 | ₹19,199.02 |
| 3 | Earth work excavation in foundation trenches in hard soil including dressing and levelling the bed up to required depth and depositing the excavated materials at places away from work site within 50mtr initial lead and 1.5mtr initial lifts T&P shoring shuttering dewatering if required etc. complete as per direction of the Engineer-in-charge. | 1,026.84 | cum | 282.88 | ₹2,90,472.5 |
| 4 | Supplying filling in foundation and plinth with sand in layers including watering, ramming, cost of conveyance, royalty and taxes of all materials, all labour T&P required for the work etc. complete as per direction of the Engineer-in-charge. (measurement will be taken on finished compacted section only). | 1,149.96 | cum | 596.29 | ₹6,85,709.65 |
| 5 | Cement concrete of propertion (1:3:6) in foundation and floors using 40mm nominal size clean hard black cursher broken granite metal of approved quality from approved quarry including lowering laying concrete in layers not exceeding 15cm thick to the required level ramming watering curing centering & shuttering etc. complete including cost conveyance royalty taxes of all materials and all labour T&P required for the work etc. complete as per direction of the Engineer-in-charge. | 123.96 | cum | 6,244.33 | ₹7,74,047.15 |
| 6 | Providing & laying Plain cement concrete (1:2:4) using 12mm size black hard crusher broken granite chips of approved quality from approved quarry including lowering laying concrete in layers not exceeding 15cm thick to the required level ramming watering curing centering & shuttering etc. complete including cost conveyance royalty taxes of all materials and all labour T&P required for the work etc. complete as per direction of the Engineer-in-charge. | 84.56 | cum | 7,844.25 | ₹6,63,309.78 |
| 7 | RCC work of M-20 in all floors having a minimum compressive strength ( in work test) 200 kg/cm2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 10mm size to 20mm size black hard crusher broken granite stone chips (10mm size 40% & 20mm size 60%) of approved quality & from approved quarry including hoisting lowering laying and compacting concrete with centering & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary and providing required No. of fan hooks as required including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of MS rod / Tor steel and binding wire and labour charges for bending binding and tying the grills etc. complete as per direction of the Engineer-in-charge.
Ground Floor
Foundation | 87.77 | cum | 6,663.04 | ₹5,84,815.02 |
| 8 | Plinth Beam | 26.89 | cum | 7,537.45 | ₹2,02,682.03 |
| 9 | Columns & Roof beam | 79.44 | cum | 16,045.86 | ₹12,74,683.12 |
| 10 | Top Copping | 23.82 | cum | 14,376.65 | ₹3,42,451.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.09 MB
Tendernotice_2.pdf
PDF • 2.45 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_606132.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].