| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.3 LAccepted-Finance 150 7 MARIAMMAN KOVIL STREET THOTTILPATTI SALEM CAMP METTUR DAM 636456 | SALEM | TAMIL NADU | 636456 | 1 | Accepted-Finance BQR SATISFIED | |
| 2 | 2₹8.6 L+₹29,693 (3.59%)Accepted-Finance 7 142 THOTILIL PATTY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 2 | Accepted-Finance BQR SATISFIED |
| Sl No | Description | Qty | Unit | SKSCONTRACTOR L2 | DHARUN ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for Fabrication and strengthening of the 100MT weigh bridge Main platform and cross structure, deck plate in Dry fly ash in silo at MTPS-I (As per PWD schedule of rates for petty iron works ) M.S chequered Plate 10mm thickness will be supplied by Contractor scope and other iron & steel Material will be supplied by TNPGCL). | 5,370 | kgs | 65 ₹3,49,050 | 62 ₹3,32,940 Lowest |
| 2.00 | Charges for dismantling, lifting, leading to the ground floor and lowering the existing 100MT weigh bridge 1 no segment. After completion of the fabrication and strengthening works reassembling the same and positioning of weigh bridge providing with necessary supports and clamps etc and dismantling of load cells from weigh bridge platform, disconnecting the of the load cell control cables and termination with junction box after completion of work realigning of both insulating pads of all 8 Nos. of load cell and repositioning., Carrying out an ‘end- middle-end’ test for Rebalance the weigh bridge. | 3 | Time | 22,000 ₹66,000 | 21,600 ₹64,800 Lowest |
| 3.00 | Charges for Cleaning, painting of fabricated and strengthened segment of 100 Ton weigh bridge platform and structures with One coat red oxide primer and two coats of A.C Black paint one over the other with proper intervals | 272 | M2 | 195 ₹53,040 | 190 ₹51,680 Lowest |
| 4.00 | Cost of M.S chequered plate ,Size : 10mm Thick, | 4.28 | MT | 75,000 ₹3,21,000 | 73,000 ₹3,12,440 Lowest |
| 5.00 | Cost of Anti Corrosive Bituminous Black paint for SL.No.1 | 51 | Liter | 100 ₹5,100 | 97 ₹4,947 Lowest |
| 6.00 | Cost of red oxide paint for SL.No.1 | 30 | Liter | 70 ₹2,100 | 68 ₹2,040 Lowest |
| 7.00 | Cost of M.S Welding Electrode (Dia :4mm x 450mm ) for SL.No.1 | 90 | KGs | 120 ₹10,800 | 117 ₹10,530 Lowest |
| 8.00 | Cost of cost of cutting gas for SL.No.1 | 6 | Set | 4,000 ₹24,000 | 3,800 ₹22,800 Lowest |
| 9.00 | Hire Charges for a higher capacity crane for lifting, leading and lowering the 100MT weighbridge segment from the weighbridge platform to the ground level for rectification, strengthening and fabrication works. | 24 | Hours | 800 ₹19,200 | 780 ₹18,720 Lowest |
| 10.00 | Cost of Consumable and hire charges for T&P: for Sl.No.1 to 6 | 1 | No | 7,000 ₹7,000 | 6,700 ₹6,700 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,700
Closing Date
28 Jul 2025, 2:00 pmClosed
CE / MTPS-I
Chief Engineer Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I OAHS III SILO Rectification and strengthening of the weakened 100MTweigh bridge platform cross structure by dismantling and strengthening with steel plate reassembling installing of load cell and calibration
2025_EB_581498_1
CE SE M II MTPS I OAHS OT 28 2025 2026
Open Tender
Miscellaneous Works
Works
45 days
MTPS-I
As per Tender Specification
7 documents required · 7 mandatory
₹0
₹7,700
Yes
4 Sept 2025
14 Jul 2025
29 Jul 2025
14 Jul 2025
28 Jul 2025
14 Jul 2025
Amount
Charges for Fabrication and strengthening of the 100MT weigh bridge Main platform and cross structure, deck plate in Dry fly ash in silo at MTPS-I (As per PWD schedule of rates for petty iron works ) M.S chequered Plate 10mm thickness will be supplied by Contractor scope and other iron & steel Material will be supplied by TNPGCL).
Charges for dismantling, lifting, leading to the ground floor and lowering the existing 100MT weigh bridge 1 no segment. After completion of the fabrication and strengthening works reassembling the same and positioning of weigh bridge providing with necessary supports and clamps etc and dismantling of load cells from weigh bridge platform, disconnecting the of the load cell control cables and termination with junction box after completion of work realigning of both insulating pads of all 8 Nos. of load cell and repositioning., Carrying out an ‘end- middle-end’ test for Rebalance the weigh bridge.
Charges for Cleaning, painting of fabricated and strengthened segment of 100 Ton weigh bridge platform and structures with One coat red oxide primer and two coats of A.C Black paint one over the other with proper intervals
Cost of M.S chequered plate ,Size : 10mm Thick,
Cost of Anti Corrosive Bituminous Black paint for SL.No.1
Cost of red oxide paint for SL.No.1
Cost of M.S Welding Electrode (Dia :4mm x 450mm ) for SL.No.1
Cost of cost of cutting gas for SL.No.1
Hire Charges for a higher capacity crane for lifting, leading and lowering the 100MT weighbridge segment from the weighbridge platform to the ground level for rectification, strengthening and fabrication works.
Cost of Consumable and hire charges for T&P: for Sl.No.1 to 6
SKSCONTRACTOR (BID ID -1412304)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .