| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹83.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹83.8 L+₹6,549.35 (0.08%)Admitted-Fee/PreQual/Technical/Finance | ₹83.8 L+₹6,549.35 (0.08%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹84.1 L+₹43,559.19 (0.52%)Admitted-Fee/PreQual/Technical/Finance | ₹84.1 L+₹43,559.19 (0.52%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/S THOUNAOJAM SANA SINGH L3 | M/S L SHANTIKUMAR SINGH L2 | P.K Singh and Brothers L1 |
|---|---|---|---|---|---|---|
| 1.00Demolishing lime concrete manually/ by mechanical means anddisposal of material within 50 metres lead as per direction ofEngineer in charge. | ||||||
| 1.10 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 52.35 | cum | 1,890 ₹98,941.5 | 1,883 ₹98,575.05 | 1,881 ₹98,470.35 Lowest |
| 2.00 | Disposal of building rubbish / malba / similar unserviceable,dismantled or waste materials by mechanical means, includingloading, transporting, unloading to approved municipal dumpingground or as approved by Engineer-in-charge, beyond 50 m initiallead, for all leads including all lifts involved | 52.35 | cum | 359 ₹18,793.65 | 357 ₹18,688.95 Lowest | 357 ₹18,688.95 Lowest |
| 3.00Centering and shuttering including strutting, propping etc. and removal of form for: | ||||||
| 3.10 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 62.4 | sqm | 1,082 ₹67,516.8 | 1,078 ₹67,267.2 | 1,077 ₹67,204.8 Lowest |
| 4.00Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. | ||||||
| 4.10 | Thermo-Mechanically Treated bars | 300.52 | kg | 124 ₹37,264.48 Lowest | 124 ₹37,264.48 Lowest | 125 ₹37,565 |
| 5.00Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level upto floor five level excluding cost of centering,shuttering, finishing and reinforcement : | ||||||
| 5.10 | 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.34 | cum | 15,811 ₹21,186.74 | 15,748 ₹21,102.32 | 15,729 ₹21,076.86 Lowest |
| 6.00Steelworkinbuiltuptubular(round,squareorrectangulartubesetc.)trussesetc.,includingcutting,hoistingfixinginpositionandapplyingaprimingcoatofapprovedsteelprimer,includingweldingandboltedincludingspecialshapedwashersetc.complete. | ||||||
Tender Value
₹83.7 L
EMD Value
₹1.7 L
Closing Date
14 Jul 2026, 3:00 pmClosed
Executive Engineer (Civil), RIMS.
Executive Engineer (Civil), RIMS.
Vertical extension of VRDL and MRU buillding at RIMS,Imphal)
2026_RIMS_915843_1
29/2026-27/RIMS/Imphal
Open Tender
Civil Works
Works
365 days
As Per Tender Document
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Director RIMS.
₹1.7 L
15 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing lime concrete manually/ by mechanical means anddisposal of material within 50 metres lead as per direction ofEngineer in charge. | |||||
| 1.1 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 52.35 | cum | 1 | ₹52.35 |
| 2 | Disposal of building rubbish / malba / similar unserviceable,dismantled or waste materials by mechanical means, includingloading, transporting, unloading to approved municipal dumpingground or as approved by Engineer-in-charge, beyond 50 m initiallead, for all leads including all lifts involved | 52.35 | cum | 1 | ₹52.35 |
| 3Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 3.1 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 62.4 | sqm | 1 | ₹62.4 |
| 4Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. | |||||
| 4.1 | Thermo-Mechanically Treated bars | 300.52 | kg | 1 | ₹300.52 |
| 5Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level upto floor five level excluding cost of centering,shuttering, finishing and reinforcement : | |||||
| 5.1 | 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.34 | cum | 1 | ₹1.34 |
| 6Steelworkinbuiltuptubular(round,squareorrectangulartubesetc.)trussesetc.,includingcutting,hoistingfixinginpositionandapplyingaprimingcoatofapprovedsteelprimer,includingweldingandboltedincludingspecialshapedwashersetc.complete. | |||||
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
BOQ_962470.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .