Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance MAIN CHOWK TABAB TILLO JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | Admitted-Finance |
| 2 | Admitted-Finance NOT AVAILABLE | Admitted-Finance |
| 3 | Admitted-Finance 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,240
Closing Date
13 Jun 2022, 3:00 pmClosed
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
MH MORH
Replacement of components of electro mechanical machinery installed at pumping station Pinger stage-0 (new).
2022_PHE_171864_1
ENIT NO. 62 OF 2022-23
Open Tender
Repair and Maintenance Works
Item Rate
10 days
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
Replacement of components of electro mechanical machinery installed at pumping station Pinger stage-0 (new).
7 documents required · 7 mandatory
₹200
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
₹2,240
18 Jun 2022
1 Jun 2022
14 Jun 2022
1 Jun 2022
13 Jun 2022
1 Jun 2022
Amount
Replacement of components of 100 KVA voltage stabilizer at Pinger stage-0 (New) by way of isolating from incoming power and disconnecting all electrical connections and making temporary arrangement for running of system by bypassing the voltage stabilizer. Dragging the stabilizer outside the pump room by deploying manual labour and with the help of tools tackles. Making of temporary arrangement so as to protect the stabilizer from rain / water during the work. Unfastening of nuts bolts and opening the top cover and then dismantling of complete unit by using chain pulley block, tripod stand or special tools and tackles to draw out its coils-02nos & rotary switch-1no. and shifting to workshop. Replacement of 02 nos. coils with new coils of superior quality complete with insulation material & varnishing and shifting back to site. Lowering the internal assembly with phase coils inside the chamber and subsequently filling of 60 liters transformer oil alongwith replacement of 01no. rotary switch, voltmeter, ampere meter, phase indicators set and panel wiring etc. Making all incoming and outgoing electrical connections and testing the stabilizer on no load at least for 6 hours and then on full load. Complete job includes cost of material, labour charges, manual carriage charges, hire charges of tools and tackles etc. (complete job).
Replacement of existing 3” dia non return valve with 3” dia CS NRV on the delivery line of Pinger Stage-0 (New) together with replacement of pipe side flanges with MS flanges as per size of NRV complete with nuts, bolts, gaskets and welding works. Complete job includes cost of material, labour charges, carriage, hire charges of tools and tackles etc. (complete job).
GANPATI ELECTRICAL AND MECHANICAL WORKS
N B Engineering and Electric Works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .