Tender Value
₹681.7 Cr
EMD Value
₹13.6 Cr
Closing Date
27 Aug 2026, 6:00 pm
Chief Engineer
Office of the CE WR Zone Kota
Soyla Artificial Reservoir Project Village Soyla Tehsil-Raipur/Jhalarapatan and District Jhalawar (Rajasthan) (E.P.C) Single responsibility Turnkey Basis (Schedule 1 to 8)
2026_WRDAS_583704_1
NIT 09 of 2026 27 CE WR Zone Kota
Open Tender
Civil Works
Item Rate
1460 days
Jhalawar
2 documents required · 2 mandatory
₹80,000
refer to tender documents
₹13.6 Cr
Yes
Office of the CE WR Zone Kota
7 Aug 2026
7 Aug 2026
31 Aug 2026
7 Aug 2026
27 Aug 2026
7 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Work of Survey, Planning, Investigation, Geological investigation of core for the purpose of artificial reservoir as decided by Geologist, Design & Drawing of Artificial Reservoir, Geophysical Investigation for Reservoir water tightness, Pipe Network & Command Area etc.
(As per Technical Specification and Scope of work ) (For Soyla Artificial reserviour Medium Irrigation Project) | - | One Job | 1.25 | - |
| 1.02 | Construction of Artificial resiviour including Ogee spillway, wing walls, key walls, Down stream apron, downstream energy dissipation arrangement, curtain / consolidation grouting for foundation treatment, Earthen Embankment including Cut-off Trench, CC Core Wall in Earthan Dam , U/s Minimum slope 3:1 and D/s Minimum Slope 2:1 with Suitable berm, Upstream Protection of Embankment (aggregate layer, sand layer, and laying of rip-rap with shoulder over sand layer), Drainage Filters (vertical/chimney filter, horizontal filter, rock toe), curtain / consolidation grouting , proper drainage arrangement over earthen Arificial Reservoir, and Downstream Filter toe and Protection of Embankment (turfing/mulching), etc. Provision for earth from Private land arranged by contractor through private negotitation with all lead and lift. and Approach road for Artificial resiviour & Intake well etc.
(As per Technical Specification and Scope of work ) (For Soyla Artificial reserviour Medium Irrigation Project) | - | One Job | - | - |
| 1.03 | Cost of Hydro Electro Mechanical works including pumps, motors, moter operated pressure reducing flow control valve (electromegnatic type), all valve arrangement, flow / pressure meter, water level recorder, control panel within the pump house and supply & installation of transformer (with one standby) etc. can be taken @ Rs 25000 per kw of capacity of total pumps (including standby capacity) Supplying, Laying, Installation, Testing and Commissioning of MS Pipe(Minimum OD 1626mm ,thickness 14.2 mm) Line from Kalisindh Submergence to artificial Reservoir, construction of approach bridge for intake well, construction of cross drainage work for feeder line and others, construction of pump house building at intake well with all associated civil, structural and ancillary works and other peripherial works for 9600 Ha CCA .
(As per Technical Specification and Scope of work ) (For Soyla Artificial reserviour Medium Irrigation Project) | - | One Job | 100 | - |
| 1.04 | Construction of buildings, including 6 No. class IV & 3 No Class III G+2 Flat Type at suitable loaction as decided by owner of Project, 1 No. Rest House at Artificial Reservoir, 2 No Watch and ward Hut at Both Intake well, and construction of 5 Nos. Water Users Association (WUA) Buildings cum chowkidar Room.
(As per Technical Specification and Scope of work ) (For Soyla Artificial reserviour Medium Irrigation Project) | - | One Job | 53 | - |
| 1.05 | Communication works, Approach road for Diggies, Artificial reservoir and Both Intake Wells, Inspection Vehicle , siren and wireless set elc
(As per Technical Specification and Scope of work ) (For Soyla Artificial reserviour Medium Irrigation Project) | - | One Job | 10 | - |
| 1.06 | Supplying, Laying, Installation, Testing and Commissioning of Pressurized Pipe Network Distribution System including Artificial Reservoir Intake to Diggies Main MS Pipe MS Pipe(Minimum 813mm ,thickness 7.1 mm) Line & DI Pipe (Minimum ID 300 mm or more) from Diggie to Chak And HDPE PIpe (Below 300 mm OD), Construction of 5 Nos Diggies , 05 Nos Pump Rooms , 05 Nos Sump well Boundary Walls with fencing at Diggies Campus ,with approach road for Diggies and Intake with all associated civil, structural and ancillary works and Cost of Hydro Electro Mechanical works including pumps, motors, moter operated pressure reducing flow control valve (electromegnatic type), all valve arrangement, flow / pressure meter, water level recorder, control panel within the pump house and supply & installation of transformer (with one standby) etc. can be taken @ Rs 25000 per kw of capacity of total pumps (including standby capacity) along with PLC-SCADA & centraliesd SCADA system for monitoring of command area water distribution, including transmission of field data and information, and all associated works, etc for 9600 Ha CCA . .
(As per Technical Specification and Scope of work ) (For Soyla Artificial reserviour Medium Irrigation Project) | - | One Job | 11 | - |
| 1.07 | Supply, installation, testing and commissioning of MNRE approved Grid tied Solar Power Plant at suitabe location as per approved drawing with inverter, meter, cable etc including Infrastructure work, supply, fixing of MNRE approved Solar PV panels, DC power interfacing panel, distribution box, Surge arresters, Erthening and lightning Protection system, Security equipment, Illumination, piping system for periodic cleaning etc. complete in all respect.
(As per Technical Specification and Scope of work ) (For Soyla Artificial reserviour Medium Irrigation Project) | - | One Job | 10 | - |
| 1.08 | Operation and Maintenance of Arificial Reservoir, Arificial Reservoir Guest House, Control Room, Solar Power Plant for all project (used for Diggi Pumps, intake structure pumps etc.) ,Office Building, Hydro-Mechanical & Electrical Works, Diggies, Pumping Stations, Pipe Network, Valves, PLC–SCADA System and all Command Area Works, including theft protection, equitable distribution of water, for a period of eight (8) years, including routine operation, preventive and breakdown maintenance, inspection, servicing, repairs, and upkeep of all associated systems, buildings, infrastructure, and installations.
(As per Technical Specification and Scope of work ) (For Soyla Artificial reserviour Medium Irrigation Project) | - | One Job | 22 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
TechnicalSoylaScedule.pdf
Additional Documents • 0.31 MB
BIDSoyla.pdf
Tender Documents • 13.00 MB
BOQ_1036855.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].