Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC H NO 309 26 MANOHAR NAGAR GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹6.1 L | L1 | Accepted-AOC being lowest agency |
| 2 | L2₹7.2 LRejected-AOC | ₹7.2 L | L2 | Rejected-AOC being non lowest agency. |
Tender Value
₹8.4 L
EMD Value
₹16,800
Closing Date
1 Apr 2026, 5:00 pmClosed
VIMAL DEEP
DIV 4 Gurugram
Annual maintenance of Sewerage scheme in Sector-1,Pataudi
2026_HBC_509809_1
2026CEB593A8 5FF9 48BB 892F 57B4C9934C50255HSV
Open Tender
Civil Works
240 days
Pataudi
2 documents required · 2 mandatory
₹500
₹16,800
Yes
25 May 2026
20 Mar 2026
2 Apr 2026
20 Mar 2026
1 Apr 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1[11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) | |||||
[21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening | - | Each | - | - | |
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | - | cum | - | - | |
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | - | Sqm | - | - | |
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars | - | Kg. | - | - | |
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | - | cum | - | - | |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_588612.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid