| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 CrAccepted-AOC | ₹9.0 Cr | L1 | Accepted-AOC OK |
| 2 | L2₹9.3 CrRejected-AOC | ₹9.3 Cr | L2 | Rejected-AOC OK |
| 3 | L3₹9.7 CrRejected-AOC | ₹9.7 Cr | L3 | Rejected-AOC OK |
| 4 | L4₹10.5 CrRejected-AOC | ₹10.5 Cr | L4 | Rejected-AOC OK |
| 5 | L5₹10.9 CrRejected-AOC VILL DHOLIYA PO PANDEYPURA BLOCK HUNTERGANJ DIST CHATRA | CHATRA | JHARKHAND | 825103 | ₹10.9 Cr | L5 | Rejected-AOC OK |
| Sl No | Description | Qty | Unit | SATYENDRA KUMAR YADAV L1 | Jai Maa Ambe Infra Private Limited L5 | NAND KISHORE SINGH CONSTRUCTION PVT LTD L2 | M/s Puja Enterprises L4 | NEELAM CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00L021-Chatra hara to chakala vaya dhamdhama , Road Length-6.190 km , Package No. JH02MARS113 | ||||||||
| 2.00 | Setting Out Pillars Providing & Fixing of Bench Mark Pillars @ four nos per km as per drawings given and direction of E/I | 6 | Per/Km | 3,440 ₹20,640 Lowest | 4,104 ₹24,624 | 3,443.2 ₹20,659.2 | 3,944 ₹23,664 | 3,614 ₹21,684 |
| 3.00 | Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I | 5.57 | Ha | 49,621.22 ₹2,76,390.2 Lowest | 59,199.27 ₹3,29,739.93 | 49,667.38 ₹2,76,647.31 | 56,891.3 ₹3,16,884.54 | 52,131.13 ₹2,90,370.39 |
| 4.00 | Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 30 | cum | 897.18 ₹26,915.4 Lowest | 1,070.35 ₹32,110.5 | 898.01 ₹26,940.3 | 1,028.62 ₹30,858.6 | 942.56 ₹28,276.8 |
| 5.00 | Compacting Original Ground :-- Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 7,236 | cum | 16.43 ₹1,18,887.48 Lowest | 19.6 ₹1,41,825.6 | 16.44 ₹1,18,959.84 | 18.83 ₹1,36,253.88 | 17.26 ₹1,24,893.36 |
| 6.00 | Construction of subgrade and earthen shoulders with free lead :-- Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with free lead as per Technical Specification Clause 303.1. Avg width = (10.20 +7.50/2) | 19,979.25 | cum | 84.65 ₹16,91,243.51 Lowest | 100.99 ₹20,17,704.46 | 84.73 ₹16,92,841.85 | 97.05 ₹19,38,986.21 | 88.93 ₹17,76,754.7 |
| 7.00 | Excavation in Cutting in Soil by manual means with lead upto 50 m:-- Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 2,553.88 | cum | 123.56 ₹3,15,557.41 Lowest | 147.41 ₹3,76,467.45 | 123.67 ₹3,15,838.34 | 141.66 ₹3,61,782.64 | 129.81 ₹3,31,519.16 |
| 8.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 2,040.85 | cum | 37.26 ₹76,042.07 Lowest | 44.45 ₹90,715.78 | 37.29 ₹76,103.3 | 42.71 ₹87,164.7 | 39.14 ₹79,878.87 |
| 9.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a free lead as per Technical Specification Clause 301.5 | 29,901.33 | cum | 83.51 ₹24,97,060.07 Lowest | 99.63 ₹29,79,069.51 | 83.59 ₹24,99,452.17 | 95.75 ₹28,63,052.35 | 87.74 ₹26,23,542.69 |
| 10.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250 m as per Technical Specification Clause 301.5 | 7,985.54 | cum | 123.03 ₹9,82,460.99 Lowest | 146.78 ₹11,72,117.56 | 123.15 ₹9,83,419.25 | 141.06 ₹11,26,440.27 | 129.25 ₹10,32,131.05 |
Tender Value
₹10.6 Cr
EMD Value
₹22 L
Closing Date
10 Jun 2026, 5:00 pmClosed
ENGINEER IN CHIEF
3rd Floor, FFP Building, Dhurwa, Ranchi, JHarkhand 834002
Construction and Maintenance of Roads and LSBs
2026_CEJHR_147673_1
NIT-09_PMJANMAN-ROAD
Open Tender
Civil - Roads and Bridges
Item Rate
545 days
CHATRA
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
₹22 L
24 Aug 2026
19 May 2026
10 Jun 2026
19 May 2026
10 Jun 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | L021-Chatra hara to chakala vaya dhamdhama , Road Length-6.190 km , Package No. JH02MARS113 | - | - | - | - |
| 2 | Setting Out Pillars Providing & Fixing of Bench Mark Pillars @ four nos per km as per drawings given and direction of E/I | - | Per/Km | 4,000 | - |
| 3 | Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I | - | Ha | 57,699.09 | - |
| 4 | Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | - | cum | 1,043.23 | - |
| 5 | Compacting Original Ground :-- Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | - | cum | 19.1 | - |
| 6 | Construction of subgrade and earthen shoulders with free lead :-- Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with free lead as per Technical Specification Clause 303.1. Avg width = (10.20 +7.50/2) | - | cum | 98.43 | - |
| 7 | Excavation in Cutting in Soil by manual means with lead upto 50 m:-- Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | - | cum | 143.67 | - |
| 8 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 1 | cum | 43.32 | ₹43.28 |
| 9 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a free lead as per Technical Specification Clause 301.5 | - | cum | 97.11 | - |
| 10 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250 m as per Technical Specification Clause 301.5 | 1 | cum | 143.06 | ₹142.92 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.10 MB
BOQ_230470.xls
BOQ • 0.43 MB
JH-02-PMJANMAN-II-CHA-01-2025-26.pdf
Tender Documents • 12.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].