Repairing of transformer at various monuments, ADMA, Jaipur.
2025_Amber_468198_1
02/2025-26
Open Tender
Electrical Works
Item Rate
30 days
Various Monuments
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Chief Executive Officer, ADMA
₹12,520
23 Jun 2025
13 May 2025
20 May 2025
13 May 2025
19 May 2025
13 May 2025
Amount
All in all Repairing, servicing, testing and energising complete in all respect of 250 KVA Transformer with major works including below:- All additional miscellaneous works related to proper functioning of transformer as per OEM recommendation also included in this scope. Complete as per pre approved by Engineer in charge. For additional technical parameters of products/works refer Annexure "A" attached with P.W.D. Electrical B.S.R. 2022.
Labour Charges for loading, unloading, Transportation from site to factory and back with Opening of 250 KVA Transformer Cover, Draining of Oil, De tanking core and coil assembling, covering and re tanking of ants, replacement of nut bolts etc.
Replacement of existing Transformer Oil and submission of Transformer oil test report (old oil shall be retained by the contractor)
Supply and filling of fresh transformer oil as per IS: 335 in existing transformer along with submission of oil test report for its physical and chemical properties. The oil shall be clear and free from any suspended matter or sediments complete as required complete in all respect.
Replacement of Packing seal /Gaskit of 250 KVA Transformer complete as reqd.
Repairing of LT/HT bushings of Distribution Transformers including replacement of brass studs, porcelain insulators, nut bolts, oil seals, gaskets etc. complete as required complete in all respect. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure "A" attached with this BSR .
LT Bushing Set 250 KVA
HT Bushing Set 250 KVA
Replacement of Silica gel Breather of Distribution Transformers of following capacities complete in all respect. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure "A" attached with this BSR 250 KVA
Replacement of gasket of Distribution Transformers of following capacities complete in all respect. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure "A" attached with this BSR 250 KVA
P& F dial type temperature gauge
Painting of 250 KVA Transformer including removing of existing paint, One coat of primer and than two coats of enamel paint complete.
Servicing of Existing old working RMU with cleaning , dust removing , checking dislocated parts , deformation , resetting operation of trip , movement of rollers and pins , remove old grease and apply new grease, checking dislocated connections, operation of auxiliary switches , electrical open close operation, checking abnormal noise etc complete with actual working conditions as per OEM recommendation & satisfied in all respect as per site required
Testing & servicing of 160 KVA transformer with Merging , fault finding report , leakage controlling & Tightening of bolts , cleaning, punching of new lugs , copper bus bar patti , nut bolt etc in all respect as per site required
Replacement of existing transformer oil confirming to IS: 335 after removing of old oil and remove from site (old oil shall be retained by the contractor)
Supply and filling of fresh transformer oil as per IS: 335 in existing transformer along with submission of oil test report for its physical and chemical properties. The oil shall be clear and free from any suspended matter or sediments complete as required complete in all respect. All as per pre approved by Engineer in charge.
Replacement of LT/HT bushings of Distribution Transformers including replacement of brass studs, porcelain insulators , nut bolts , oil seals , gaskets etc. complete as required complete in all respect. All as per pre approved by Engineer in charge.
LT Bushing Set 160 KVA
HT Bushing Set 160 KVA
Replacement of Silica gel Breather of Distribution Transformers of 160 KVA capacity complete in all respect. All as per pre approved by Engineer in charge.
Replacement of gasket of Distribution Transformers of 160 KVA capacity complete in all respect. All as per pre approved by Engineer in charge.
Servicing of Existing old working RMU with cleaning , dust removing , checking dislocated parts , deformation , resetting operation of trip , movement of rollers and pins , remove old grease and apply new grease, checking dislocated connections, operation of auxiliary switches , electrical open close operation, checking abnormal noise etc complete with actual working conditions as per OEM recommendation & satisfied in all respect as per site required
Painting of 160 KVA transformer after removal of existing paint with two layer of Red oxide paint, one layer of epoxy based paint and one layer of enamel paint complete in all respect.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .