Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹5.8 L+₹1.3 L (30.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹5.9 L+₹1.5 L (33.0%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹6.2 L+₹1.8 L (39.8%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical REJECT |
| Sl No | Description | Qty | Unit | VISHWAKARMA ELITE CONSTRUX L4 | M/s Prince Construction L1 | SON VIR L2 | M/S RINKU CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance including lift upto 1.50 mt. and lead upto 30 mt. Including ramming and dressing by manual labour . The earth from clearence to be used in side embankment or to be disposed off spoil bank or as directed by Engineer-in-Charge. | 6,016 | Cum | 83 ₹4,99,328 | 55 ₹3,30,880 Lowest | 61 ₹3,66,976 | 62 ₹3,72,992 |
| 2.00 | Earth work in silt clearance with slush, lahel and cartage upto 1.0 Km. Including lift upto 1.50 mt. And lead upto 30.00 mt. including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-charge. | 987 | Cum | 83 ₹81,921 | 45 ₹44,415 Lowest | 165 ₹1,62,855 | 168 ₹1,65,816 |
| 3.00 | Scrapping internal Section of Existing Channel i.e. Bed & Slope with silt upto 5 cm. | 11,342 | Sqm | 3.4 ₹38,562.8 Lowest | 6 ₹68,052 | 4.1 ₹46,502.2 | 4.5 ₹51,039 |
Tender Value
₹6.2 L
EMD Value
₹12,400
Closing Date
6 Oct 2026, 4:55 pmClosed
EE BGGC BSR
EE BGGC BSR
Silt Clearance of Hasangarh Dy. From Km 0.000 to 12.600
2026_UPIDC_1188144_38
04/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Bulandshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹12,400
9 Oct 2026
1 Oct 2026
6 Oct 2026
1 Oct 2026
6 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearance including lift upto 1.50 mt. and lead upto 30 mt. Including ramming and dressing by manual labour . The earth from clearence to be used in side embankment or to be disposed off spoil bank or as directed by Engineer-in-Charge. | 6,016 | Cum | - | - |
| 2 | Earth work in silt clearance with slush, lahel and cartage upto 1.0 Km. Including lift upto 1.50 mt. And lead upto 30.00 mt. including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-charge. | 987 | Cum | - | - |
| 3 | Scrapping internal Section of Existing Channel i.e. Bed & Slope with silt upto 5 cm. | 11,342 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.90 MB
BOQ_2248999.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .