| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAccepted-Finance | L1 | Accepted-Finance low | |
| 2 | L2₹30.5 L+₹79,737.01 (2.69%)Accepted-Finance | L2 | Accepted-Finance high |
Tender Value
₹30.1 L
EMD Value
₹31,000
Closing Date
11 Mar 2024, 3:00 pmClosed
BDO VP
KNR union
Construction of Village Panchayat Office Building in Bharathy Nagar at Tharapakkam Panchayat
2024_RDTN_435812_1
KNR 3 / AGAMT / 2024 / A10 / Dated 29.02.2024
Open Tender
Civil Works - Buildings
Works
120 days
Tharapakkam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹31,000
Yes
12 Mar 2024
2 Mar 2024
11 Mar 2024
2 Mar 2024
11 Mar 2024
2 Mar 2024
Amount
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation
Supplying and filling with filling River sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete For Foundation
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Cement concrete 1:2:4 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and Filling the U/S gravel from appd quarry including cost and conveyance and filling charges etc., as per std. Specification
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. Upto Base
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. Above Base
Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., Upto Base
Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., Above Base
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Upto base
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Above base
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Fabrication and supply of Mild Steel Door of any required size with double leaf,outter frame of 35x35x 5mm equal MSL angle and shutter frame made of 25x25x5mm equal MSL angle for horizontal and vertical members and the shutter frame strengthened by stiffeners of 2Nos.horizontal and 3 Nos. diagonal for each shutter using M S flat of size 20x5mm fully covered with 18 gauge plain M S full sheet welded with shutter frame neatly and also fixin by welding 6 Nos. of hold fasts,2 Nos. wind appliances,3 Nos. tower bolts,1 No. aldrop2 Nos. handles, fixing shutterwith6 Nos.of hinges with outter frame of the door
Fabrication and supply of Mild Steel Window of any required size with Three leaf.Outter frame of 35x35x 5mm equal MSL angle, Mullion section made of 35x 35x5mm equal T-section, shutter frame made of 25x25x5mm equal MSL angle for horizontal and vertical members and the shutter frame strengthened by stiffeners of 1No.horizontal for each shutter using M S flat of size 20x5mm fully covered with 18 gauge plain M S full sheet
Labour charges for fixing of Doors and From in including all labor charges etc.,complete
labour charges for fixing Windows and Ventilators along with Frames in position etc.,complete
Supplying and fixing line polished Cuddapah Slab of Cost of 20 / 30mm thick Cup -board and black etc.,complete
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:5 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Supplying and fixing in position white / colour glazed Indian Water Closet of best quality and approved make with 100 mm "P" or "S" trap connecting with CI pipe of 100mm dia / PVC pipe of
Supplying and fixing in position white / colour glazed European Water Closet of best quality and approved make with 100 mm "P" or "S" trap connecting with CI pipe of 100mm dia / PVC pipe of
Supplying and Fixing of RCC Jolly of siz 0.45 x 0.45m including all charges etc.,complete
Supply and fixing of Rain water PVC pipe of 110mm dia
Paving the floor with First Quality Double Charged Vitrified Tiles 600mm x 600mm x 8mm in all floors over a base layer of C.M. 1:3 mix, 20mm thick and pointed with white Cement mixed with colouring pigments at the rate of 0.3Kg/Sqm including finishing neatly and curing, etc., complete
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers
Dadooing walls with Dadooing Ceramic tiles of size 300 x 600 x 10mm in all floors laid in C.M. 1:2mix 10mm thick and pointed with white Cement mixed with colouring pigments at the rate of 0.4Kg/Sqm including finishing neatly and curing, etc., complete
Providing Granolithi Floor Finish in Cement Concrete 1 : 2: 4 mix using 10-12 mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing laying , Curing etc.,complete for 10 cum
Emulsion Paint two coats with best approved paint including cost of painting priming coat over new plastered surface and conveyance of all materials to site and all labour charges
Painting two Coat over New iron work using ready mixed Enamel paint including cost and conveyance of all materials to site and all labour charges for mixing layingetc
Provision for PVC Sintex tank 1000 Litres capacity
Supplying and fixing of Rolling Shutter including all cost and conveyance of all materials etc .,complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
E.SEKAR
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_518247.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .