Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.7 LAccepted-AOC | L1 | Accepted-AOC Lottery winner | |
| 2 | L1₹97.7 LRejected-AOC | L1 | Rejected-AOC Lottery looser | |
| 3 | L1₹97.7 LRejected-AOC | L1 | Rejected-AOC Lottery looser | |
| 4 | L1₹97.7 LRejected-AOC | L1 | Rejected-AOC Lottery looser | |
| 5 | L1₹97.7 LRejected-AOC | L1 | Rejected-AOC Lottery looser |
Tender Value
₹97.7 L
EMD Value
₹97,800
Closing Date
8 Apr 2026, 5:00 pmClosed
Superintending Engineer Angul R and B Division
O/O the Superintending Engineer Angul RB Division
Construction of 2 nos. D type staff quarters for CHC, Kosala (Civil, EI, PH).
2026_EICCL_127581_2
SE (R and B) Angul-77/ 2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
ANGUL
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹97,800
Yes
6 Oct 2026
25 Mar 2026
9 Apr 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Part-A (Civil Work)
Dismantling Works
Dismantling brick or stone masonry in clay under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead | - | Cum | - | - |
| - | Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead | - | Cum | - | - |
| - | Disposal of building rubbish / malba /rock/ similar unserviceable, dismantled or waste materials by mechanical means within 1km Lead away from the site, including loading, transporting, unloading to approved dumping ground or as approved /directed by Engineer-in-charge, including cost of equipments/ labour, conveyance, T&P and taxes etc. as per the direction of Engineer-in-charge. | - | Cum | - | - |
| - | Dismantling and removing doors, windows and ventilators,ceilings, partitions etc including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead. | 1 | Sqm | - | - |
| - | New Construction Works
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including cost of all labours, T & P, sundries etc. as required for the work complete as per the direction of the Engineer-in-charge. | 1 | Sqm | - | - |
| - | Earth work in excavation in foundation trenches, column foundation, pit, etc in all kind of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge.
Upto 1.5 Mtr Depth | - | Cum | - | - |
| - | From 1.5 Mtr upto 3.0 Mtr Depth | - | Cum | - | - |
| - | Supplying, diluting and preparing chemical emulsion like CHLORPYRIPHOS or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as pre-constructional anti termite treatment and creating a chemical barrier under and around wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, surrounding the pipes and conduits etc. complete at the rate of 7.5 liters (or as directed by the manufacturer) per sqm on vertical and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center etc.complete as per IS:6313/1981(Part-II) and as per the direction of the Engineer -in-charge including all cost of materials, labour and T&P etc all complete. | 1 | Cum | - | - |
| - | Supplying and filling with sand in foundation and plinth in layers not exceeding 20 cm in depth, well watered and compacted , top surface dressed and levelled to proper level and gradient including cost of all materials, conveyance,royalties, loading, unloading, cost of all labour, T&P, etc. all complete as per the direction of Engineer-in-Charge. | 1 | Cum | - | - |
| - | Providing and laying Plain Cement Concrete of proportion (1:4:8) using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | 1 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_586266.xls
BOQ • 2.63 MB
5DtypeCHCKosala.pdf
Tender Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .