| 1 | L1₹6.3 LAdmitted-Finance | -26.00% | ₹6.3 L | L1 | Admitted-Finance |
| 2 | L2₹6.8 LAdmitted-Finance GALI NO 1 KRISHNA NAGAR MAINPURI | -20.11% | ₹6.8 L | L2 | Admitted-Finance |
| 3 | L3₹7.0 LAdmitted-Finance | -16.87% | ₹7.0 L | L3 | Admitted-Finance |
Tender Value
₹8.5 L
EMD Value
₹84,598
Closing Date
11 May 2026, 12:00 pmClosed
CHIEF ENGINEER
nagar nigam agra
Chhatta Zone, Ward No. 58 (Chandra Nagar Gulab Nagar) Construction of the boundary wall and installation of grills for the park located in front of Virendra Parmar residence.
2026_DOLBU_1139314_1
16-04-2026/NAGAR NIGAM AGRA/06-05-2026/131
Open Tender
Construction Works
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NAGAR NIGAM
₹84,598
26 May 2026
5 May 2026
11 May 2026
5 May 2026
11 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of site for workable condition including disposal of malva from the site. | 1 | Job | 2,000 | ₹2,000 |
| 2 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) | 36 | Cum | 140 | ₹5,040 |
| 3 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) | 5.76 | Cum | 5,325 | ₹30,672 |
| 4 | Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2) | 27.76 | Cum | 5,650 | ₹1,56,844 |
| 5 | Class-150 brick work in 1:4 cement and coarse sand, mortar in Super Structrure including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapte No. 06 S.I. No. 2+5) | 55.2 | Cum | 6,260 | ₹3,45,552 |
| 6 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.
(c) 1 Cement : 4 Coarse sand.
(Chapter No.13 Si.No.582(ii)) | 480 | Sqm | 200 | ₹96,000 |
| 7 | RCC work Providing and laying in position specified grade of reinforced cement concrete , including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth leuel:1:2:4 in raft foundation (1cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size) | 0.8 | Cum | 7,750 | ₹6,200 |
| 8 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level.
(b) 10mm to 12mm tor.
(Chapter No. 10 S.I. No. 504(B)) | 62.8 | Kg | 85 | ₹5,338 |
| 9 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc, complete. Hot finished welded type tubes | 1,600 | Kg | 105 | ₹1,68,000 |
| 10 | Providing and laying Cement Concrete in 1:2:4 of not less than strength of M-15 stone grit (20 mm nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors.(5-Chapter Sr.No.6 Si.No..4.1.3) | 1.84 | Cum | 6,600 | ₹12,144 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.59 MB
BOQ_2132951.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid