Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance C O OPPOSITE BDO OFFICE MANDA AKHNOOR DISTT JAMMU PIN 181201 | JAMMU | JAMMU AND KASHMIR | 181201 | Admitted-Finance |
| 2 | Admitted-Finance 214 2ND FLOOR SAMRUDDHI COMMERCIAL PREMISES CHINCHOLI BUNDER ROAD MINDSPACE MALAD WEST | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹25.7 L
EMD Value
₹51,500
Closing Date
8 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DIRECTOR,TIFR
TIFR,MUMBAI
REPAIR WORK AT BADMINTON HALL NEAR RECREATION CENTRE BUILDING AT TIFR,MUMBAI
2023_DAE_740364_1
TIFR/PD/CF22-100/222459
Open Tender
Civil Works
Works
240 days
TIFR
AS PER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹51,500
TIFR,MUMBAI
15 Mar 2023
14 Feb 2023
9 Mar 2023
14 Feb 2023
8 Mar 2023
27 Feb 2023
27 Feb 2023
Scaffolding Work
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineering-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding
Providing, erecting and dismantling (after completion of work) double bamboo scaffold with verticals @ 1.2 to 1.8m inner as well outer faces and horizontals for working platform etc. The height of the scaffold to be erected would be maximum 35' feet. The scaffolding should have a provision for continuous working platform constructed by aides to be strutted diagonally to prevent from buckling under the weight of men and materials, at comfort levels for the men and the artisans to work which is 6" to 9" inches away from the wall or chajja or any projections of the wall. The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding
Dismantling Work
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: Asbestos cement sheet
Structural Repairing
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement. Including complete curring. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Steel reinforcement for R.C.C. work including straightening, cutting, bending, rebaring, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
6 mm plaster on cement concrete or reinforced cement concrete work with white cement based polymer modified self curing mortar & RUSTICIDE Chemical coat on steel bars of approved make as per the direction of Engineer-In-Charge.
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix :Including complete curring. 1:4 (1 cement: 4 fine sand)
18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge/Sand face plaster as as per the direction of Engineer-In-Charge. Including complete curring.
Providing all tools, labour, material for laying micro concrete to the damaged structural member according to following operations: 1) Clean the surface and remove loose concrete, any dust, oil, paint, grease etc. 2) Expose fully any corroded steel in the repair area and remove all scale and corrosion deposits. High pressure jet cleaning is highly recommended. 3) Apply approved make rust remover over the clean re-bars and allow dry before continuing. 4) a.Saturate the substrate with water to prevent absorption of water from the mixed material of Micro Concrete b. For a dry substrate, it should be primed by applying one coat of bonding coat. 5) Mix approved make of Micro Concrete with water (3.75 to 4 litters per 25 kg bag) till homogeneous mix is obtained, at 30 C. 6) Mixing should be done thoroughly with a forced action mixer of adequate capacity, at least for 5minutes. 7) Pour or pump the mixed Micro Concrete into a watertight shuttering in the repaired area, when primer area becomes tacky. 8) Cure the repaired surface for minimum 7 days.
Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) : With Modular bricks
Crack Repairing Work
Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honey-comb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in- Charge. (The payment shall be made on the basis of actual weight of approved grout injected.) Note:- Groove (V) must be open 6mm wide & 12-15 mm deep. Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
External Paint
Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives. New work (Two or more coats applied @ 1.43 litre/ 10 sqm. Over and including priming coat of exterior Primer applied @ 0.90 litre/10 sqm.
Structural Steel Paint
Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
Internal Paint
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre
Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats
Bitumen Waterproofing Work
Providing and applying one coat of bitumen to roof (without cloth) including scaffolding etc. complete as directed.
Roofing Work
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/ m²
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Any unforeseen item not covered above, executed from CPWD Delhi Schedule of Rates 2018 upto a base value of Rs. 1,75,700/- Hint: Bidder is supposed to quote rate for this item in column (green) at value which is at a certain percentage above or below the rate of DSR 2018. For e.g. if the estimated rate is Rs.1,75,700/- then bidder should quote rate of Rs. 1,93,270/- incase he intends item in this part to be paid at the rate of 10% above DSR 2021 or Rs. 1,58,130/- incase he intends item in this part to be paid 10% below the DSR 2021 The value given in the rate for this item shall be used to derive the rate to be paid for the item from DSR 2018
DEEPAK ENTERPRISES
ORIENTAL INTEGRATED FACILITY MANAGEMENT PVT. LTD.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .