Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance BIRBHUM TIKARBETA JOYDEB KENDULI BARDHAMAN BARDHAMAN 713324 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713324 | ₹4.8 L | L1 | Accepted-Finance TC recommendation |
| 2 | Rejected-Technical STATION ROAD UKHRA BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical TC recommendation |
| 3 | Rejected-Technical BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | S S ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 2.00 | Dismantling of complete pump (7 STAGE Flowmore) | 1 | EA | 3,300 ₹3,300 Lowest |
| 3.00 | Making G.M. Block bush | 2 | EA | 6,820 ₹13,640 Lowest |
| 4.00 | Making G.M. Ring bush | 8 | EA | 1,650 ₹13,200 Lowest |
| 5.00 | Making G.M. Ring bush (small) | 7 | EA | 1,320 ₹9,240 Lowest |
| 6.00 | Making G.M. Check nut | 1 | EA | 6,050 ₹6,050 Lowest |
| 7.00 | Making G.M. Shaft sleeve bush | 1 | EA | 7,150 ₹7,150 Lowest |
| 8.00 | Making G,M. Relief Bush | 1 | EA | 3,300 ₹3,300 Lowest |
| 9.00 | Making G.M. body screw X"x1/2" | 1 | EA | 1,650 ₹1,650 Lowest |
| 10.00 | Bye pass pipe line making | 1 | EA | 1,980 ₹1,980 Lowest |
Tender Value
₹4.8 L
EMD Value
₹6,000
Closing Date
20 Mar 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
(A) Minor repairing of Flow more-7 stage, Volcan- 6 stage and 3UP-3 stage Pu (B) Minor repairing (1) 4stage Flow more pump and (2) MLA 6 pump o
2026_ECL_356210_1
ECL/GM/BA/E TENDER/25-26/ENM/373 Dt 10.03.2026
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Nakrakonda Kumardihi B Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
14 May 2026
10 Mar 2026
21 Mar 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
10 Mar 2026 - 14 Mar 2026
Item Description/ Heading
Dismantling of complete pump (7 STAGE Flowmore)
Making G.M. Block bush
Making G.M. Ring bush
Making G.M. Ring bush (small)
Making G.M. Check nut
Making G.M. Shaft sleeve bush
Making G,M. Relief Bush
Making G.M. body screw X"x1/2"
Bye pass pipe line making
Test cope fitting
Making G.M. balance valve setting
Making G.M. Gland bush
Empeller machining
Body packing
Rubber sheet
Pump refitting charges with supply of bolt nut etc.
Dismantling of complete pump (Volcun 6 stage)
Making G.M. Block bush
Making G.M. Ring bush
Making G.M. Ring bush (small)
Making G.M. Check nut
Making G.M. Shaft sleeve bush
Making G,M. Relief Bush
Making G.M. body screw "x1/2"
Bye pass pipe line making
Test cope fitting
Making MS new shaft
Making G.M. balance valve setting
Making G.M. Gland bush
Empeller machining
Body packing
Rubber sheet
Pump refitting charges with supply of bolt nut etc.
Dismantling of complete pump (3UP3 )
Making new shaft
Making G.M. Sleeve Bush
Making G.M. Check nut
Making G.M. Ring bush
Making GM shaft sleeve bush
Making G.M. Block bush & fitting
Making G.M. Gland bush
Making new Impeller
Body seat rubber packing
Making new stud
Test cock fitting
Making by pass pipe line
Pump refitting charges
Dismantling of complete pump (4 stage Flowmore)
Making G.M. Block bush
Making G.M. Ring bush
Making G.M. Ring bush (small)
Making G.M. Check nut
Making G.M. Shaft sleeve bush
Making G,M. Rellef Bush
Making G.M. body screw X"x1/2"
Bye pass pipe line making
Test cope fitting
Making MS new shaft
Making G.M. balance valve setting
Making G.M. Gland bush
Empeller machining
Body packing
Rubber sheet
Pump refitting charges with supply of bolt nut etc.
Dismantling of complete pump (MLA-6 Pump)
Making G.M. Block bush
Making G.M. Ring bush
Making G.M. Ring bush (small)
Making G.M. Check nut
Making G.M. Shaft sleeve bush
Making G,M. Relief Bush
Making G.M. body screw %"x1/2"
Bye pass pipe line making
Test cope fitting
Making G.M. Gland bush
Making new shaft
Making G.M. balance valve setting
Empeller machining
Body packing
Rubber sheet
Pump refitting charges with supply of bolt nut etc.
Transporting charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.91 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_369057.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .