Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC FLAT NO 2450 KRISHNA COLONY JIND 126102 | JIND | HARYANA | 126102 | ₹1.2 Cr | L1 | Accepted-AOC rates are justified |
| 2 | L2₹1.2 Cr+₹8,683.82 (0.07%)Rejected-AOC HOUSE NO 3123 66 WARD NO 23 SATI COLONY REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | ₹1.2 Cr+₹8,683.82 (0.07%) | L2 | Rejected-AOC rates are on higher side |
| 3 | L3₹1.3 Cr+₹63,701.66 (0.51%)Rejected-AOC DHANI CHANDPUR BAWAL ROAD REWARI DHANI CHANDPUR BAWAL ROAD REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | ₹1.3 Cr+₹63,701.66 (0.51%) | L3 | Rejected-AOC rates are on higher side |
| 4 | L4₹1.4 Cr+₹13.7 L (11.0%)Rejected-AOC | ₹1.4 Cr+₹13.7 L (11.0%) | L4 | Rejected-AOC rates are on higher side |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
12 Jan 2022, 6:00 pmClosed
Executive Engineer
Garhi Bolni Road, Rewari
Nayagaon detailed estimate for construction of waterworks at village Nayagaon, providing FHTC connection and distribution system, construction of RCC pipe inlet channel, brick lined SandS tank, raw and clear water suction wells, high level tank, filt
2022_HRY_202828_1
96906-PHE/Prog. date 08.12.2021
Open Tender
Civil Works
Works
365 days
Village Nayagaon
Please refer to tender document
3 documents required · 3 mandatory
₹15,000
₹3.2 L
3 Mar 2022
5 Jan 2022
13 Jan 2022
5 Jan 2022
12 Jan 2022
5 Jan 2022
Amount
Raw water pumping machinery - supplying, erection, testing and commissioning of horizontal motor pumping set for clear water having head 15.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP make: KSB, CRI, Kirlosker, Crompton Greeve, Lubi Water works- 400 LPM x 15 M Head (5.00 BHP)
Supply, erection, testing of reputed make LED light 100 wats with fittings and accessories complete in all respect.
Operation and Maintenance - Operation and maintenance for the complete scope of work mentioned in the DNIT (Disinfection material will be supplied by the PHED) as per schedule-IV during Defect Liability Period of 12 months after trial run period of 3 months and 5 years thereafter (will be charged to annual maintenance estimate) Defect Liability Period
Operation and Maintenance during 1st year
Operation and Maintenance during 2nd year
Operation and Maintenance during 3rd year
Operation and Maintenance during 4th year
Operation and Maintenance during 5th year
Bidder Name
Amount
Sachin Goyal(GSTN-NA)
GABBAR SINGH SUHAG(GSTN-NA)
Rakesh Yadav Contractor(GSTN-NA)
M/S AAR PEE CONSTRUCTION COMPANY JIND(GSTN-NA)
M/S AAR PEE CONSTRUCTION COMPANY JIND
Sachin Goyal
GABBAR SINGH SUHAG
M/S AAR PEE CONSTRUCTION COMPANY JIND
GABBAR SINGH SUHAG
Rakesh Yadav Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .